Differences between revisions 1 and 15 (spanning 14 versions)
Revision 1 as of 2014-01-04 15:08:41
Size: 35
Comment:
Revision 15 as of 2016-03-22 22:37:13
Size: 3297
Editor: YuKataoka
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 Overview of IFI written by K. Somiya[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3537|IFI report]]
 
 Proposal for KAGRA IO Faraday Isolator written by G. Muller and D.B. Tanner [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3461|Proposal for KAGRA IO Faraday Isolator]]
= Basic Configuration =
 *IFI is seated on the baseplate because the beam hight of KAGRA is different from aLIGO.
 *Ray tracing was calculated by K. Yano [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4233|Current ray trace around the IFI]]
== Parameter of IFI ==
 * Weight : 18.1kg
 * Size : L=647.7mm, W=177.8mm, H=155.9mm (with bread bord) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3538|IFI Drawing]]
{{{#!wiki red/solid'''ATTENTION!'''
The hight of IFI is different from CAD file}}}
== Parameter of baseplate of IFI ==
 * Weight : 26.9kg
 * Size : L=630mm, W=250mm, H=64.1mm [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4161|Base of the IFI Drawing]]
= Current Status =
 * IFI was purchased from UF
 * IFI was completed to Assemble on the PSL table in 2015/11
 * Installation was completed in 2015/11
 * Alignment was completed in 2016/02
 * IFI will not be suspended but directly put on the IFI table
 * A pair of unsuspended steering mirrors (STM) have been used for the beam centering
Line 3: Line 24:
TBA === Pending Problems ===
 * Total hight of IFI system ( = IFI + Baseplate) is higher than the designed beam hight by 1cm.
 * Is CWP2 replacement needed ?
 * How we test IFI in high power.
 * How to measure the scattering light from IFI and how to dump that ?
 * Connecting IFI to the digital system.
 * Is installing [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4551|counter masses]] needed ?


== Related documents ==
 *[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4822|Slide of JPS meeting in March 22nd 2015 written by Kataoka]]
 *[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4822|Slide in 13th f2f meeting written by Kataoka]]
 *[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3440|Slide of JPS meeting in March 21st 2015 written by Kataoka]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3295|Slide in 11th f2f meeting written by Yano]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3460|measurement result in Dec.2014]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2104|First Report by Somiya in 2014/1]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2192|Magnetic noise estimation by Somiya]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2227|Scatter-light noise estimation by Somiya]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2330|Apperture noise estimation by Somiya]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2486|IFI Layout by Somiya]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2474|STM noise by Nakano]]

Input Faraday Isolator

Basic Configuration

Parameter of IFI

  • Weight : 18.1kg
  • Size : L=647.7mm, W=177.8mm, H=155.9mm (with bread bord) IFI Drawing

The hight of IFI is different from CAD file

Parameter of baseplate of IFI

Current Status

  • IFI was purchased from UF
  • IFI was completed to Assemble on the PSL table in 2015/11
  • Installation was completed in 2015/11
  • Alignment was completed in 2016/02
  • IFI will not be suspended but directly put on the IFI table
  • A pair of unsuspended steering mirrors (STM) have been used for the beam centering

Pending Problems

  • Total hight of IFI system ( = IFI + Baseplate) is higher than the designed beam hight by 1cm.
  • Is CWP2 replacement needed ?
  • How we test IFI in high power.
  • How to measure the scattering light from IFI and how to dump that ?
  • Connecting IFI to the digital system.
  • Is installing counter masses needed ?

KAGRA/Subgroups/IOO/IFI (last edited 2016-03-22 22:37:39 by YuKataoka)