Size: 245
Comment:
|
Size: 623
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* IFI will be purchased from UF * Assembly on the PSL table is scheduled in 2014/11 * Installation will be in 2015/3 * IFI will not be suspended but directly put on the IFI table * A pair of unsuspended steering mirrors (STM) will be used for the beam centering |
|
Line 6: | Line 12: |
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2474|STM noise]] (2014/6) |
Input Faraday Isolator
- IFI will be purchased from UF
- Assembly on the PSL table is scheduled in 2014/11
- Installation will be in 2015/3
- IFI will not be suspended but directly put on the IFI table
- A pair of unsuspended steering mirrors (STM) will be used for the beam centering
Report by Kentaro (2014/1)
IFI Layout (2014/6)
STM noise (2014/6)