=== Related documents ===

Input Faraday Isolator

  • IFI will be purchased from UF
  • Assembly on the PSL table is scheduled in 2014/11
  • Installation will be in 2015/3
  • IFI will not be suspended but directly put on the IFI table
  • A pair of unsuspended steering mirrors (STM) will be used for the beam centering