Input Faraday Isolator
- IFI will be purchased from UF
- Assembly on the PSL table is scheduled in 2014/11
- Installation will be in 2015/3
- IFI will not be suspended but directly put on the IFI table
- A pair of unsuspended steering mirrors (STM) will be used for the beam centering