Line 33: Line 33:
  
Line 39: Line 40:
 * Leak test was done and had no problem for the OMC area
 * the copper PD sockets were delivered, planned to be replaced after O3
 * QPD drivers were delivered, but haven't tested yet
 * PZT drier was ordered to AEL
 * Alignment the OSTM trans beam to OMC was done
 * QPD signal, OMC resonance was seen
Line 44: Line 51:
 * GG leaving on xxx  * GG leaving on early June

IOO meeting 2019 0513

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Kokeyama, Nakano, Ge, Nagano, Yamakoh, Ohkawa, Aso, Tanioka

Announcements

Conferences

Recent Status

PSL

IMC

  • IMC ASC mostly commissioned. Waiting for the good timing for the IP mirror position change.

OMC, OMMT, OSTM

  • Leak test was done and had no problem for the OMC area
  • the copper PD sockets were delivered, planned to be replaced after O3
  • QPD drivers were delivered, but haven't tested yet
  • PZT drier was ordered to AEL
  • Alignment the OSTM trans beam to OMC was done
  • QPD signal, OMC resonance was seen

Visitor

  • Fujikawa-kun (Niigata, Ohkawa-lab) joins Kamioka from August for IOO/Detchar. Regular telecon with Yokozawa-kun started.
  • Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka
  • GG leaving on early June