Differences between revisions 4 and 19 (spanning 15 versions)
Revision 4 as of 2019-05-10 09:54:53
Size: 1215
Comment:
Revision 19 as of 2019-05-14 09:32:02
Size: 1942
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Kokeyama, Nakano, Ge, Nagano, Yamakoh, Ohkawa, Aso, Tanioka, Sato
Line 10: Line 11:
 * Nakano-kun becomes the IOO chief  * Nakano-kun becomes the IOO chief (official approval is planned in the last week of May)
Line 12: Line 13:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/IOO/Members2017|2019 IOO Membership confirmed]]
  * Fujikawa-kun (M1), Koyama-kun (B4) joined from Niigata
 * [[KAGRA/Subgroups/IOO/Members2017|2019 IOO Membership confirmed]]
 * [[KAGRA/Subgroups/IOO/LightTools|Light_Tools is available for KAGRA work]]
Line 17: Line 18:
 * KIW 7 Wuhan 6/21-23 http://kiw6.csp.escience.cn/dct/page/1  * KIW6 Wuhan 6/21-23 http://kiw6.csp.escience.cn/dct/page/1
Line 22: Line 23:
 * TAUP 2019 in Toyama, 9/9-13, http://taup2019.icrr.u-tokyo.ac.jp/
Line 27: Line 28:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10166]]
Line 28: Line 30:
 * IMC ASC mostly commissioned. Waiting for the IP mirror position change.   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10192]]

  
===
IMC ===

 * IMC
ASC mostly commissioned. Waiting for the good timing for the IP mirror position change.
Line 31: Line 39:
 * Leak test was done and had no problem for the OMC area
 * the copper PD sockets were delivered, planned to be replaced after O3
 * QPD drivers were delivered, but haven't tested yet
 * PZT drier was ordered to AEL
 * Alignment the OSTM trans beam to OMC was done
 * QPD signal, OMC resonance was seen
Line 36: Line 50:
 * GG leaving on early June

IOO meeting 2019 0513

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Kokeyama, Nakano, Ge, Nagano, Yamakoh, Ohkawa, Aso, Tanioka, Sato

Announcements

Conferences

Recent Status

PSL

IMC

  • IMC ASC mostly commissioned. Waiting for the good timing for the IP mirror position change.

OMC, OMMT, OSTM

  • Leak test was done and had no problem for the OMC area
  • the copper PD sockets were delivered, planned to be replaced after O3
  • QPD drivers were delivered, but haven't tested yet
  • PZT drier was ordered to AEL
  • Alignment the OSTM trans beam to OMC was done
  • QPD signal, OMC resonance was seen

Visitor

  • Fujikawa-kun (Niigata, Ohkawa-lab) joins Kamioka from August for IOO/Detchar. Regular telecon with Yokozawa-kun started.
  • Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka
  • GG leaving on early June

KAGRA/Subgroups/IOO/Meeting/Meeting20190513 (last edited 2019-05-14 09:32:02 by KeikoKokeyama)