Size: 2621
Comment:
|
Size: 1222
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Ge, Somiya, Uehara, Nakano, | |
Line 11: | Line 11: |
* IOO meeting is fixed on Mon. 17:00~18:00 | |
Line 22: | Line 23: |
* Engineering run has been done on 6/8. * KOACH and AC operation need to be fixed. * will be discussed on the commissioning meeting on 6/11. (Kokeyama-san will summerize it) * RefCav might be better to be evacuated again for the temperature drift. * Nakano will check the data about the FSS. * We saw the alignment drift due to the temperature drift. * Short-term ASC would be worthful. * IOO manual is missing. |
|
Line 32: | Line 24: |
* Laser POW MON (IMC IN) is fixed and working *[[klog|http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]] * Beam shutter driver is modified and works well in PSL *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8993]] * We need to check the spectrum of IMC TRANS, REFL, and an error signal. And more? * MZM was removed. *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8957]] * MZM paper is on-going (2nd-draft was circulated) * 3rd-draft will be circulated before CPC circulation * Izumi-san, Michimura-san, and Yamakoh will have a meeting about it in Tokyo before 3rd-circulation. |
* cleanness of the PSL room w.o. KOACH *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]] |
Line 44: | Line 28: |
* measured the asc sensmat with the new position of IP1 isn't good. *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8982]] * The beam size on each IP need to be the same. We need to re-design. * However, still it would be good to implement the short-term IP-ASC. It can compensate for the IP drift. * Added on the ToDos for O3 * HPBD thermometer ongoing * Miyo-kun is testing the read-out circuit. * On Wednesday, we will have a data on the DGS channel. |
* IMC alignment script *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9374]] * IMC error signal investigation *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9364]] |
Line 54: | Line 35: |
* OSTM replacement is on-going * The mirror will be changed to a thicker one. Matteo is negotiating with a company. * TAMA-IMC will be used for OSTM suspension, and Takahashi-san is working on it. * Replacement is scheduled on September. |
* OMC commissioning is on going. * The OMC transmission is too small [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404]] * ugly cavity scan [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428]] |
Line 59: | Line 39: |
=== Others === * IFI chamber optics meeting on 6/10 * IFO-REFL table power adjustment system needs to be designed. MIF will work on it. |
=== Niigata === * Double demodulation * Scattering measurement == Visitor == * GG come back soon? |
Line 63: | Line 46: |
== Visitor == * Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka (6/11) * GG left last week, and come back on end of this month == Next meeting == * The meeting schedule will be changed. Nakano will arrange the new candidate. |
== Meeting schedule == * 8/5 (Mon.) * 9/2 (Mon.) * 10/7 (Mon.) * 11/5 (Tue.)? * 12/2 (Mon.) |
IOO meeting 2019 0708
Connection
Zoom2: https://zoom.us/j/6676627462
Participants
Ge, Somiya, Uehara, Nakano,
Announcements
- IOO meeting is fixed on Mon. 17:00~18:00
- If you need a slot for a talk or a poster at next F2F meeting, please let Nakano know.
Conferences
KIW6 Wuhan 6/21-23 http://kiw6.csp.escience.cn/dct/page/1
- IOO status talk by Nakano
- MZM talk by Guiguo
- August F2F meeting, Toyama, 8/22-24
Recent Status
PSL
- cleanness of the PSL room w.o. KOACH
IMC
- IMC alignment script
- IMC error signal investigation
OMC, OMMT, OSTM
- OMC commissioning is on going.
The OMC transmission is too small http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404
ugly cavity scan http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428
Niigata
- Double demodulation
- Scattering measurement
Visitor
- GG come back soon?
Meeting schedule
- 8/5 (Mon.)
- 9/2 (Mon.)
- 10/7 (Mon.)
- 11/5 (Tue.)?
- 12/2 (Mon.)