Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2019-07-08 11:07:56
Size: 2621
Comment:
Revision 7 as of 2019-07-08 18:00:48
Size: 1957
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa, Takahashi,
Line 11: Line 11:
 * IOO meeting is fixed on Mon. 17:00~18:00
Line 19: Line 20:
== Recent Status ==
=== PSL ===
 * cleanness of the PSL room w.o. KOACH
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]]
 
=== IMC ===
 * IMC alignment script
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9374]]
 * IMC error signal investigation
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9364]]
Line 21: Line 32:
== Recent Status ==
 * Engineering run has been done on 6/8.
  * KOACH and AC operation need to be fixed.
   * will be discussed on the commissioning meeting on 6/11. (Kokeyama-san will summerize it)
  * RefCav might be better to be evacuated again for the temperature drift.
   * Nakano will check the data about the FSS.
  * We saw the alignment drift due to the temperature drift.
   * Short-term ASC would be worthful.
  * IOO manual is missing.
=== OMC, OMMT, OSTM ===
 * OMC commissioning is on going.
  * The OMC transmission is too small [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404]]
  * ugly cavity scan [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428]]
  * Beam profile of injection beam into the OMC looks fine [reported soon]
  * Still we are not sure it comes from the alignment issue. One of the OMC team (maybe Otabe-kun?) will come to Kamioka, and will investigate it. We wouldn't pull it out from the chamber this Wednesday, but we need to decide as soon as possible.
 * OSTM replacement
  * The modification parts were delivered and checked in Mitaka. Takahashi-san will come to Kamioka next week for the OSEM check.
=== Niigata ===
 * Double demodulation
  * First Koyama-kun will discuss with Michimura-san, and then start the experiment in Kamioka.
 * Scattering measurement
  * Tsugai-kun and Murakami-kun is working to improve the S/N ratio of the measurement, and they will have a poster at F2F meeting.
 
== Visitor ==
 * GG come back next week.
Line 31: Line 49:
=== PSL ===
 * Laser POW MON (IMC IN) is fixed and working
  *[[klog|http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]]
 * Beam shutter driver is modified and works well in PSL
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8993]]
  * We need to check the spectrum of IMC TRANS, REFL, and an error signal. And more?
 * MZM was removed.
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8957]]
 * MZM paper is on-going (2nd-draft was circulated)
  * 3rd-draft will be circulated before CPC circulation
  * Izumi-san, Michimura-san, and Yamakoh will have a meeting about it in Tokyo before 3rd-circulation.
 
=== IMC ===
 * measured the asc sensmat with the new position of IP1 isn't good.
  *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8982]]
  * The beam size on each IP need to be the same. We need to re-design.
  * However, still it would be good to implement the short-term IP-ASC. It can compensate for the IP drift.
  * Added on the ToDos for O3
 * HPBD thermometer ongoing
  * Miyo-kun is testing the read-out circuit.
  * On Wednesday, we will have a data on the DGS channel.

=== OMC, OMMT, OSTM ===
 * OSTM replacement is on-going
  * The mirror will be changed to a thicker one. Matteo is negotiating with a company.
  * TAMA-IMC will be used for OSTM suspension, and Takahashi-san is working on it.
  * Replacement is scheduled on September.

=== Others ===
 * IFI chamber optics meeting on 6/10
 * IFO-REFL table power adjustment system needs to be designed. MIF will work on it.

== Visitor ==
 * Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka (6/11)
 * GG left last week, and come back on end of this month

== Next meeting ==
 * The meeting schedule will be changed. Nakano will arrange the new candidate.
== Meeting schedule ==
 * 8/5 (Mon.)
 * 9/2 (Mon.)
 * 10/7 (Mon.)
 * 11/5 (Tue.)?
 * 12/2 (Mon.)

IOO meeting 2019 0708

Connection

Zoom2: https://zoom.us/j/6676627462

Participants

Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa, Takahashi,

Announcements

  • IOO meeting is fixed on Mon. 17:00~18:00
  • If you need a slot for a talk or a poster at next F2F meeting, please let Nakano know.

Conferences

Recent Status

PSL

IMC

OMC, OMMT, OSTM

  • OMC commissioning is on going.
    • The OMC transmission is too small http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404

    • ugly cavity scan http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428

    • Beam profile of injection beam into the OMC looks fine [reported soon]
    • Still we are not sure it comes from the alignment issue. One of the OMC team (maybe Otabe-kun?) will come to Kamioka, and will investigate it. We wouldn't pull it out from the chamber this Wednesday, but we need to decide as soon as possible.
  • OSTM replacement
    • The modification parts were delivered and checked in Mitaka. Takahashi-san will come to Kamioka next week for the OSEM check.

Niigata

  • Double demodulation
    • First Koyama-kun will discuss with Michimura-san, and then start the experiment in Kamioka.
  • Scattering measurement
    • Tsugai-kun and Murakami-kun is working to improve the S/N ratio of the measurement, and they will have a poster at F2F meeting.

Visitor

  • GG come back next week.

Meeting schedule

  • 8/5 (Mon.)
  • 9/2 (Mon.)
  • 10/7 (Mon.)
  • 11/5 (Tue.)?
  • 12/2 (Mon.)

KAGRA/Subgroups/IOO/Meeting/Meeting20190708 (last edited 2019-07-08 18:00:48 by MasaykiNakano)