Size: 2621
Comment:
|
← Revision 7 as of 2019-07-08 18:00:48 ⇥
Size: 1957
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa, Takahashi, | |
Line 11: | Line 11: |
* IOO meeting is fixed on Mon. 17:00~18:00 | |
Line 19: | Line 20: |
== Recent Status == === PSL === * cleanness of the PSL room w.o. KOACH *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]] === IMC === * IMC alignment script *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9374]] * IMC error signal investigation *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9364]] |
|
Line 21: | Line 32: |
== Recent Status == * Engineering run has been done on 6/8. * KOACH and AC operation need to be fixed. * will be discussed on the commissioning meeting on 6/11. (Kokeyama-san will summerize it) * RefCav might be better to be evacuated again for the temperature drift. * Nakano will check the data about the FSS. * We saw the alignment drift due to the temperature drift. * Short-term ASC would be worthful. * IOO manual is missing. |
=== OMC, OMMT, OSTM === * OMC commissioning is on going. * The OMC transmission is too small [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404]] * ugly cavity scan [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428]] * Beam profile of injection beam into the OMC looks fine [reported soon] * Still we are not sure it comes from the alignment issue. One of the OMC team (maybe Otabe-kun?) will come to Kamioka, and will investigate it. We wouldn't pull it out from the chamber this Wednesday, but we need to decide as soon as possible. * OSTM replacement * The modification parts were delivered and checked in Mitaka. Takahashi-san will come to Kamioka next week for the OSEM check. === Niigata === * Double demodulation * First Koyama-kun will discuss with Michimura-san, and then start the experiment in Kamioka. * Scattering measurement * Tsugai-kun and Murakami-kun is working to improve the S/N ratio of the measurement, and they will have a poster at F2F meeting. == Visitor == * GG come back next week. |
Line 31: | Line 49: |
=== PSL === * Laser POW MON (IMC IN) is fixed and working *[[klog|http://klog.icrr.u-tokyo.ac.jp/osl/?r=9365]] * Beam shutter driver is modified and works well in PSL *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8993]] * We need to check the spectrum of IMC TRANS, REFL, and an error signal. And more? * MZM was removed. *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8957]] * MZM paper is on-going (2nd-draft was circulated) * 3rd-draft will be circulated before CPC circulation * Izumi-san, Michimura-san, and Yamakoh will have a meeting about it in Tokyo before 3rd-circulation. === IMC === * measured the asc sensmat with the new position of IP1 isn't good. *[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8982]] * The beam size on each IP need to be the same. We need to re-design. * However, still it would be good to implement the short-term IP-ASC. It can compensate for the IP drift. * Added on the ToDos for O3 * HPBD thermometer ongoing * Miyo-kun is testing the read-out circuit. * On Wednesday, we will have a data on the DGS channel. === OMC, OMMT, OSTM === * OSTM replacement is on-going * The mirror will be changed to a thicker one. Matteo is negotiating with a company. * TAMA-IMC will be used for OSTM suspension, and Takahashi-san is working on it. * Replacement is scheduled on September. === Others === * IFI chamber optics meeting on 6/10 * IFO-REFL table power adjustment system needs to be designed. MIF will work on it. == Visitor == * Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka (6/11) * GG left last week, and come back on end of this month == Next meeting == * The meeting schedule will be changed. Nakano will arrange the new candidate. |
== Meeting schedule == * 8/5 (Mon.) * 9/2 (Mon.) * 10/7 (Mon.) * 11/5 (Tue.)? * 12/2 (Mon.) |
IOO meeting 2019 0708
Connection
Zoom2: https://zoom.us/j/6676627462
Participants
Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa, Takahashi,
Announcements
- IOO meeting is fixed on Mon. 17:00~18:00
- If you need a slot for a talk or a poster at next F2F meeting, please let Nakano know.
Conferences
KIW6 Wuhan 6/21-23 http://kiw6.csp.escience.cn/dct/page/1
- IOO status talk by Nakano
- MZM talk by Guiguo
- August F2F meeting, Toyama, 8/22-24
Recent Status
PSL
- cleanness of the PSL room w.o. KOACH
IMC
- IMC alignment script
- IMC error signal investigation
OMC, OMMT, OSTM
- OMC commissioning is on going.
The OMC transmission is too small http://klog.icrr.u-tokyo.ac.jp/osl/?r=9404
ugly cavity scan http://klog.icrr.u-tokyo.ac.jp/osl/?r=9428
- Beam profile of injection beam into the OMC looks fine [reported soon]
- Still we are not sure it comes from the alignment issue. One of the OMC team (maybe Otabe-kun?) will come to Kamioka, and will investigate it. We wouldn't pull it out from the chamber this Wednesday, but we need to decide as soon as possible.
- OSTM replacement
- The modification parts were delivered and checked in Mitaka. Takahashi-san will come to Kamioka next week for the OSEM check.
Niigata
- Double demodulation
- First Koyama-kun will discuss with Michimura-san, and then start the experiment in Kamioka.
- Scattering measurement
- Tsugai-kun and Murakami-kun is working to improve the S/N ratio of the measurement, and they will have a poster at F2F meeting.
Visitor
- GG come back next week.
Meeting schedule
- 8/5 (Mon.)
- 9/2 (Mon.)
- 10/7 (Mon.)
- 11/5 (Tue.)?
- 12/2 (Mon.)