Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2019-07-08 11:20:39
Size: 1194
Comment:
Revision 5 as of 2019-07-08 17:01:05
Size: 1240
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa,
Line 30: Line 30:
* IMC error signal investigation  * IMC error signal investigation

IOO meeting 2019 0708

Connection

Zoom2: https://zoom.us/j/6676627462

Participants

Ge, Somiya, Uehara, Nakano, Ohkawa, Fujikawa,

Announcements

  • IOO meeting is fixed on Mon. 17:00~18:00
  • If you need a slot for a talk or a poster at next F2F meeting, please let Nakano know.

Conferences

Recent Status

PSL

IMC

OMC, OMMT, OSTM

Niigata

  • Double demodulation
  • Scattering measurement

Visitor

  • GG come back soon?

Meeting schedule

  • 8/5 (Mon.)
  • 9/2 (Mon.)
  • 10/7 (Mon.)
  • 11/5 (Tue.)?
  • 12/2 (Mon.)

KAGRA/Subgroups/IOO/Meeting/Meeting20190708 (last edited 2019-07-08 18:00:48 by MasaykiNakano)