Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2016-07-01 15:30:27
Size: 13
Comment:
Revision 8 as of 2016-08-05 09:47:14
Size: 2428
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

[[attachment:Note_First_Meeting]]

== 7/1 Skype Telecon ==
 * KC and JGP will consider closer for the optical configuration (please upload new info)
 * KK will check if we have all necessary components
 * KK, KC and JGP will discuss about the disital software in Seoul
 * SK and KK will meet in Kamioka for a preparation (8/10)
 * We'll have another skype meeting before the site work

== 7/8 in Sogang University ==
 * JGP will prepare the drawing of the configuration (on the pylon optical table)
 * JGP will prepare the required circuits (signal amps).
 * For the online data taking and analysis, we will need a digital model and MEDM screens. JGP will prepare the initial concept of the digital software.
 * With the prepared concept, we will build the model and make MEDM screens during KC/JGP visit (~1day).
 * We noticed that the digital software cannot do arc tangent. We will consider to use an approximation.
 * As planned, KK and SK will collect the necessary hardware on 8/10 (DC power supply, 50m cable, cable adaptors, AA filter)
 * KK will let JGP know about the Dsub 9 pin assignment to connect to an AA filter.

== 8/2 Skype Telecon ==
=== Preparation ===
 * JGP will get the drawing in a few days.
 * All the parts will arrive today. KC and JGP will carry them (no shipping).
 * JGP will assemble and test the circuits this week. Reports will be made next week.
 * Model and MEDM screens will be prepared with Kirii-kun on 8/10 as well as the first phase of the visit.
 * KC will think about the approximation formula of art tangent to use in the digital model.
 * SJ will submit the "tunnel entrance form" for the experiment.
 * KK will send the Dsub pin assignment today.
 * KK will find AA filter soon.

=== Other note ===
 * No IR laser beam during the experiment.
 * We have to check again about the safety lecture.

=== Next meeting ===
 * Next meeting will be 8/5 9:20 am. KK will call everyone on skype.
 
== 8/4 ==
 * Parts arrived and some mechanical parts were wrong, but now they are fixed. JGP will assemble today.
 * The drawing of the optical table (python table) will be done today by JGP.
 * Test result of the setup will be emailed.
 * KK will check the algorithm and will let you know today.
 * Check the safety rule.
 * SJ will submit the mine entrance form.
 * JGP will carry the clumps (which is to fix the sensor on the table).

Meeting

Note_First_Meeting

7/1 Skype Telecon

  • KC and JGP will consider closer for the optical configuration (please upload new info)
  • KK will check if we have all necessary components
  • KK, KC and JGP will discuss about the disital software in Seoul
  • SK and KK will meet in Kamioka for a preparation (8/10)
  • We'll have another skype meeting before the site work

7/8 in Sogang University

  • JGP will prepare the drawing of the configuration (on the pylon optical table)
  • JGP will prepare the required circuits (signal amps).
  • For the online data taking and analysis, we will need a digital model and MEDM screens. JGP will prepare the initial concept of the digital software.
  • With the prepared concept, we will build the model and make MEDM screens during KC/JGP visit (~1day).
  • We noticed that the digital software cannot do arc tangent. We will consider to use an approximation.
  • As planned, KK and SK will collect the necessary hardware on 8/10 (DC power supply, 50m cable, cable adaptors, AA filter)
  • KK will let JGP know about the Dsub 9 pin assignment to connect to an AA filter.

8/2 Skype Telecon

Preparation

  • JGP will get the drawing in a few days.
  • All the parts will arrive today. KC and JGP will carry them (no shipping).
  • JGP will assemble and test the circuits this week. Reports will be made next week.
  • Model and MEDM screens will be prepared with Kirii-kun on 8/10 as well as the first phase of the visit.
  • KC will think about the approximation formula of art tangent to use in the digital model.
  • SJ will submit the "tunnel entrance form" for the experiment.
  • KK will send the Dsub pin assignment today.
  • KK will find AA filter soon.

Other note

  • No IR laser beam during the experiment.
  • We have to check again about the safety lecture.

Next meeting

  • Next meeting will be 8/5 9:20 am. KK will call everyone on skype.

8/4

  • Parts arrived and some mechanical parts were wrong, but now they are fixed. JGP will assemble today.
  • The drawing of the optical table (python table) will be done today by JGP.
  • Test result of the setup will be emailed.
  • KK will check the algorithm and will let you know today.
  • Check the safety rule.
  • SJ will submit the mine entrance form.
  • JGP will carry the clumps (which is to fix the sensor on the table).

KAGRA/Subgroups/IOO/TiltSensor/Meeting (last edited 2017-06-13 15:32:24 by KeikoKokeyama)