76
Comment:
|
363
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* KC and JGP check the optical cofiguration. * KK will check if we have all necessary components * KK, KC and JGP will discuss about the disital software in Seoul * SK and KK will meet in Kamioka for a preparation (8/10) * We'll have another skype meeting before the site work |
Meeting
7/1 Skype Telecon
- KC and JGP check the optical cofiguration.
- KK will check if we have all necessary components
- KK, KC and JGP will discuss about the disital software in Seoul
- SK and KK will meet in Kamioka for a preparation (8/10)
- We'll have another skype meeting before the site work