Size: 1134
Comment:
|
Size: 1981
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
?/? | |
Line 6: | Line 5: |
7/1 Skype Telecon | == 7/1 Skype Telecon == |
Line 13: | Line 12: |
7/8 | == 7/8 in Sogang University == |
Line 22: | Line 21: |
== 8/2 Skype Telecon == === Preparation === * JGP will get the drawing in a few days. * All the parts will arrive today. KC and JGP will carry them (no shipping). * JGP will assemble and test the circuits this week. Reports will be made next week. * Model and MEDM screens will be prepared with Kirii-kun on 8/10 as well as the first phase of the visit. * KC will think about the approximation formula of art tangent to use in the digital model. * SJ will submit the "tunnel entrance form" for the experiment. * KK will send the Dsub pin assignment today. * KK will find AA filter soon. === Other note === * No IR laser beam during the experiment. * We have to check again about the safety lecture. == Next meeting == * Next meeting will be 8/5 9:20 am. KK will call everyone on skype. |
Meeting
7/1 Skype Telecon
- KC and JGP will consider closer for the optical configuration (please upload new info)
- KK will check if we have all necessary components
- KK, KC and JGP will discuss about the disital software in Seoul
- SK and KK will meet in Kamioka for a preparation (8/10)
- We'll have another skype meeting before the site work
7/8 in Sogang University
- JGP will prepare the drawing of the configuration (on the pylon optical table)
- JGP will prepare the required circuits (signal amps).
- For the online data taking and analysis, we will need a digital model and MEDM screens. JGP will prepare the initial concept of the digital software.
- With the prepared concept, we will build the model and make MEDM screens during KC/JGP visit (~1day).
- We noticed that the digital software cannot do arc tangent. We will consider to use an approximation.
- As planned, KK and SK will collect the necessary hardware on 8/10 (DC power supply, 50m cable, cable adaptors, AA filter)
- KK will let JGP know about the Dsub 9 pin assignment to connect to an AA filter.
8/2 Skype Telecon
Preparation
- JGP will get the drawing in a few days.
- All the parts will arrive today. KC and JGP will carry them (no shipping).
- JGP will assemble and test the circuits this week. Reports will be made next week.
- Model and MEDM screens will be prepared with Kirii-kun on 8/10 as well as the first phase of the visit.
- KC will think about the approximation formula of art tangent to use in the digital model.
- SJ will submit the "tunnel entrance form" for the experiment.
- KK will send the Dsub pin assignment today.
- KK will find AA filter soon.
Other note
- No IR laser beam during the experiment.
- We have to check again about the safety lecture.
Next meeting
- Next meeting will be 8/5 9:20 am. KK will call everyone on skype.