(design) - Electrical connection changed - Design will be fix by the next week

- About having oplev and tilt sensor at the same time on one set of pylons - Additional time to investigate necessary - At least MCE will have both oplev and tiltsens at the same time - We will design and make a light wind-sheild - MCO and MCI configuration? Can two sensors be installed at the same time? Keiko will send a picture and Junegyu will check how we can have them - Can oplev QPD and tilt sensor be mounted together - probably difficult. - KK will talk to Miyazawa-san about his question of the channel numbers.

(fabrication) - A small company Kyuman knows can manufacture the sets of tiltsensors for 1.5 Myen. - Seiji will ask if we can buy things from non-Japanese company - 3 sensors for 3 mirrors. No spare. The prototype one we used last time can be reserved as a spare.

(schedule) — fabrication — - Kyuman thinks we can start ordering as soon as the design is fixed - Kyuman and the company together to transfer the technique, which will take some time. - Deliver time will be in the end of August.

— installation - - Sometime in October. Kyuman can stay for a week, Junegyu can stay for 3 weeks in total.

— people — - We will find maybe one student (shift call or what?) - Kirii-kun won’t be able to help due to his master thesis work

(paper) - 5 Hz noise? We could test with also MCI, MCO to see if the other suspensions have the peak or not - Kokeyama will ask Nakano-kun about the co-author (Nakano and Kambara?) - Aim to have a first deadline by the end of April (Junegyu’s deadline 23rd on the experimental part)

(other) Seiji is visiting Sogang university in May.