Differences between revisions 15 and 16
Revision 15 as of 2016-02-23 21:59:11
Size: 2366
Comment:
Revision 16 as of 2016-02-23 22:01:54
Size: 2545
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
  * PR2 alignment (Michimura et al)
  * beam profiling at PR3 (Michimura et al)
Line 21: Line 23:
  * PR3 rough alignment into IXA (Michimura et al)
  * beam profiling at IXA (Michimura et al)

iKAGRA Commissioning

Commissioners at the site

  • Feb 24 (Wed): Miyakawa, Kokeyama, Aso(PR2 install)
  • Feb 25 (Thu): Miyakawa, Kokeyama, Aso(PR2 install)
  • Feb 26 (Fri): Miyakawa, Kokeyama
  • Feb 27 (Sat): Kokeyama, Akutsu
  • Feb 28 (Sun):
  • Feb 29 (Mon): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Aso
    • IMC stabilization (Kawamura,Enomoto)
    • finish IMMT1T QPD setup (Akutsu,Michimura)
    • prepare for IXC+IXA vent (Kimura)
    • prepare for IXA clean booth cleaning (Michimura,Kataoka)
  • Mar 01 (Tue): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Aso
    • IMC stabilization (Kawamura,Enomoto)
    • IXC+IXA vent (Kimura)
    • IXA clean booth clean up (Michimura,Kataoka)
  • Mar 02 (Wed): Miyakawa, Kokeyama, Michimura, Enomoto, Akutsu, Aso
    • finish IMC stabilization (Kawamura,Enomoto)
  • Mar 03 (Thu): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Akutsu, Aso
    • PR2 alignment (Michimura et al)
    • beam profiling at PR3 (Michimura et al)
  • Mar 04 (Fri): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Aso
    • PR3 rough alignment into IXA (Michimura et al)
    • beam profiling at IXA (Michimura et al)
  • Mar 05 (Sat): Kokeyama, Kataoka
  • Mar 06 (Sun): Kataoka
  • Mar 07 (Mon): Miyakawa, Kokeyama, Michimura, Ushiba, Kuwahara, Kataoka, Akutsu, Aso
  • Mar 08 (Tue): Miyakawa, Kokeyama, Michimura, Ushiba, Kuwahara, Kataoka, Akutsu, Aso
  • Mar 09 (Wed): Miyakawa, Kokeyama, Michimura, Ushiba, Kuwahara, Akutsu, Aso
  • Mar 10 (Thu): Miyakawa, Kokeyama, Michimura, Akutsu, Aso
  • Mar 11 (Fri): Miyakawa, Kokeyama, Michimura, Akutsu?, Aso
  • Mar 12 (Sat): Kokeyama
  • Mar 13 (Sun):
  • Mar 14 (Mon): Miyakawa, Kokeyama, Aso
  • Mar 15 (Tue): Miyakawa, Michimura, Aso

What we do

  • confirm mirror actuators (picomotors, coils, OSEMs) work from digital system
  • prepare oplevs and cameras
  • prepare RT models and MEDM screens for mirrors and LSC
  • prepare feet, pedestals for large beam profiler and DC PDs
  • REFL optics
  • stable operation of IMC
  • initial alignment: JGW-T1604823

  • lock 3km Michelson


LCGT Commissioning plan (As of Aug 2012)

Schedule

  • List up issues to be addressed for installation procedure (September)
  • Detailed installation plan (October)
  • General Commissioning Strategy (how to deploy man power etc) (by the end of November)

List of items necessary for commissioning

The List is Here.