= LCGT Commissioning plan = = iKAGRA Commissioning =
== Commissioners at the site ==
http://densuke.biz/list?cd=wgUxhq6KHdfsUnWW
Line 3: Line 5:

== TO DO before Apr 11 ==
 * IMC and MICH Noise budgeting using Simulink Noise``Budget
 * replace EXA end viewport for EX2 camera
 * check anchors and bolts for vacuum tanks
 * open the GVs
 * oplev stability, noise measurements (with mirror fixed)
 * scattering noise investigation
 * PR3 transfer function measurements, noise measurements
 * IMC ASC
 * EX, EY coil balance at higher frequency (~10Hz. Done for DC)
 * Make online calibration model
 * BS Oplev QPD diagonalization, coil balance
 * put the PMC control back to remote mode
 * stabilize IMC lock

== TO DO before Mar 26 ==
 * insert PR2-BS duct B) Done
 * evacuate IXA and IYA (we do not evacuate anything in March)
 * IOO cabling check (?)
 * get PMC back to remote control mode (To be done by Apr 11)
 * coil balancing for BS, ETMX, ETMY B) Done except BS
 * coil offload with picomotors for BS, ETMX, ETMY (and PR3 yaw) B) Done
 * oplev damping for BS, ETMX, ETMY, PR3 B) Done
 * more alignment to maximize contrast, clipping investigation B) Done, 75%MAX
 * measure power at REFL port from X and Y arms B) Done
 * install REFL camera (steal IMMT1T camera) B) Done
 * check LSC model B) Done
 * lock Michelson and measure openloop transfer function B) Done
 * MICH guardian B) Done
 * calibration model (Partially Done)
 * get strain spectrum (Done one shot, done for offline)


== Initial alignment work ==
=== first week ===
 * Feb 24 (Wed): Miyakawa, Kokeyama, Aso
  * PR2 install (Aso et al) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=825|DONE]]
  * PR3 install (Shoda et al)
 * Feb 25 (Thu): Miyakawa, Kokeyama, Aso
  * PR3 install (Shoda et al) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=831|DONE]]
  * oplev and camera for ETMX (Akutsu,Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=834|DONE]] (not calibrated yet)
 * Feb 26 (Fri): Miyakawa, Kokeyama
  * PR3 install, check signals (Shoda et al) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=852|DONE]]
  * install X end machines (Kokeyama) B)  [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=853|DONE]]
  * oplev and camera for ETMY (Akutsu,Simon) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=854|DONE]] (not calibrated yet)
 * Feb 27 (Sat): Kokeyama, Akutsu
  * install Y end machines (Kokeyama) B) DONE
  * EY camera (Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=856|DONE]]
 * Feb 28 (Sun):
 * Feb 29 (Mon): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Akutsu, Aso
  * IMC stabilization (Kawamura,Enomoto)
  * finish IMMT1T QPD setup (Akutsu,Michimura,Kataoka) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=862|DONE]]
  * prepare for IXC+IXA vent (Kimura)
  * peel PR3 first contact (Shoda,Fujii) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=863|DONE]]
  * check PR2 picomotors (Aso,Miyo) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=869|DONE]]
  * EX camera (Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=865|DONE]]
  * install PR2 viewport for the camera, and the camera (Akutsu,Kokeyama) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=866|half done]] (no camera yet)
 * Mar 01 (Tue): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Akutsu, Aso
  * turn on PR3 local damping (Shoda,Okutomi,Fujii) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=872|DONE]]
  * pedestals for PDs (Michimura,Tomaru) B) ARRIVED
 * Mar 02 (Wed): Miyakawa, Kokeyama, Michimura, Enomoto, Akutsu, Aso, Furuhata, Kambara
  * put PRM-PR3 bellows (MIRAPRO 8:00-11:00) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=878|DONE]]
  * put BS-IXC bellows (MIRAPRO PM?) B) DONE
  * IMC stabilization (Kawamura,Enomoto)
  * IXC+IXA vent (Kimura) B) DONE
  * finish IXA clean booth clean up, bring clean goods (Kimura,Tomaru) B) DONE
  * peel ETMX first contact and set coils (Ohishi,Shoda,Aso) REMAINING ISSUE
  * install BS viewports for the oplev and the camera(Akutsu,Michimura,Kambara,Furuhata) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=882|half done]] (45deg issue, IPC issue)
  * install PR3 viewport for the camera, and the camera (Akutsu,Shoda,Okutomi,Fujii) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=876|half done]] (no camera yet)
  * k1cam0 and k1cam1 setup (Kokeyama) B) DONE
  * DAQ networks for EX and EY (Miyakawa,Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=874|DONE]]
  * calibrate PR3 oplev (Shoda,Okutomi,Fujii) B) DONE
 * Mar 03 (Thu): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Akutsu, Aso, Furuhata, Kambara
  * high power IMC (Enomoto) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=891|DONE]] (~850 mW)
  * [[KAGRA/Subgroups/MIF/Commissioning/PR2Alignment|PR2 alignment, beam profiling at PR3]] [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=886|half done]] (beam profiling not yet)
  * check IMMT2 picomotor (Miyo,Doi) B) DONE
  * ETMX,ETMY,BS picomotor (Miyo) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=888|mostly DONE]] (ETMX to be confirmed)
  * setup PDs at EXA (Akutsu,Fujii) B) DONE
  * peel ETMY first contact and set coils (Ohishi,Takahashi) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=893|DONE]]
  * PR2, PR3, BS, IMMT1T cameras (Kokeyama) PR2 DONE, BS and PR3 to be done
  * ETMX first contact issue: WE DECIDED TO GO WITH REMAINING FIRST CONTACT
 * Mar 04 (Fri): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Furuhata, Kambara
  * [[KAGRA/Subgroups/MIF/Commissioning/iKAGRA0304|PR3 rough alignment into IXA]] (Michimura,Ushiba,Kuwahara,Okutomi,Kambara,Furuhata) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=907|DONE]] (beam profiling at IXA not yet)
  * DQ channels for EXA EYA PDs (Kokeyama) B) Done
  * fix IPC errors (Miyakawa, Kokeyama) B) Done
  * open BS-IXC GV (Saito,Uchiyama,Kimura) B) DONE
  * place ND filters to MC_REFL and PMC_TRANS cameras, and check ghost beams (Enomoto) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=905|DONE]] (decreased power to ~250 mW)
 * Mar 05 (Sat): Kokeyama, Kataoka
  * sweep PR3 and wait for end PDs to get any signal (automatically or Kataoka?) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=923|NO SUCESS]]
  * Swap picomotor network switch and install new pico switch on IOO rack (Kataoka, Kokeyama)
  * Install the second camera POE switch on PR2 rack (Kataoka, Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=921|DONE]]
  * Set RFM card to k1ioo chassis (Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=922|DONE]]
 * Mar 06 (Sun): Kataoka
  * block PSL beam for VAC work (Uchiyama)

=== second week ===
 * Mar 07 (Mon)
  * beam clipping at BS check, BS rough alignment into Y, IXA beam check with respect to PR3 alignment, beam profiling at IXA?, sweep PR3 at night (Michimura,Ushiba,Kataoka,Kambara,Furuhata,Okutomi)
  * check ETMX actuation (Ohishi,Takahashi) B) DONE
  * calibrate ETMX oplev (Kuwahara) B) DONE
  * ETMX picomotor check (Miyo) B) DONE
  * install EXA end flange (Tomaru) B) DONE
  * calibrate ETMY oplev (Kokeyama,Kuwahara) B) DONE
  * PR3 oplev calibration result, check PR3 oplev channels (Kokeyama,Okutomi) B) DONE
  * RFM test between center area and both ends (Kokeyama)
 * Mar 08 (Tue)
  * install BS oplev and calibrate (Akutsu,Hasegawa,Kuwahara) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=949|DONE]]
  * fine adjustment of PR3 alignment to BS and IXA, Xarm viewport, PR3 sweep to EXA (Michimura,Shoda,Okutomi,Ushiba,Furuhata,Kagawa,Fujisawa) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=946|DONE]]
  * install EXA end viewport (Akutsu,Hasegawa,Kuwahara) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=948|DONE]]
  * check ETMY actuation (Ohishi,Takahashi,Kuwahara) B) DONE
  * install EYA end flange (Kimura,Tomaru) B) DONE
  * VIS guardian (Shoda,Okutomi,Kokeyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=950|DONE]]
 * Mar 09 (Wed)
  * BS actuation check (Ushiba,Kuwahara,Furuhata) B) DONE
  * setup PD at EYA (Akutsu,Hasegawa,Kambara) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=968|DONE]]
  * install EYA end viewport (Akutsu,Hasegawa,Kambara) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=966|DONE]]
  * take PD from EXA, EXA beam check, ETMX rough alignment (Michimura,Fujii) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=972|DONE]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=975|DONE]]
  * setup PD at BS (Akutsu,Hasegawa,Kambara) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=967|DONE]]
  * EXA end, EYA end cameras (Kokeyama) B) DONE
  * RFM network between center and Yend (Kokeyama) B) DONE
 * Mar 10 (Thu)
  * connect BS-IYC (MIRAPRO) B) DONE
  * start EXA evacuation (Kimura) B) DONE
  * block Y arm beam (Akutsu,Kambara,Hasegawa) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=981|investigated]]
  * LED from EYA to BS (Miyoki) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=983|failed]] -> try brighter LED
 * Mar 11 (Fri)
  * connect PR2-PR3 duct (MIRAPRO) B) DONE
  * sweep ETMX and wait for AS PD to get any signal (Miyo,Hasegawa)
  * sweep BS and wait for ETMY PD to get any signal (Fujii,Furuhata)
 * Mar 12 (Sat)
  * partially connect PR2-BS duct (MIRAPRO)
  * LED from EYA to BS (Tomaru,Uchiyama,Hasegawa,Miyo) failed
 * Mar 13 (Sun)
  * BS PD to face X (Uchiyama) B) DONE

=== third week ===
  * EXA vent (Saito,Tomaru) B) DONE
  * ETMX alignment re-adjustment (Uchiyama) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1034|DONE]]
  * viewport for IXA (Michimura) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1023|DONE]]
  * BS alignment re-adjustment (Uchiyama?) B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1029|DONE]]
  * ETMY oplev re-calibration B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1031|DONE]]
  * IYA vent (Kimura?) B) DONE
  * get the beam back to IFI and then to REFL B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1037|DONE]]
  * set up REFL optics and cabling B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1039|DONE]]
  * beam to and from X and Y arms B) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1058|DONE]]


== What we do ==
 * confirm mirror actuators (picomotors, coils, OSEMs) work from digital system
 * prepare oplevs and cameras
 * prepare RT models and MEDM screens for mirrors and LSC
 * prepare feet for large beam profiler
 * prepare pedestals for DC PDs
 * REFL optics
 * stable operation of IMC
 * initial alignment: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4823|JGW-T1604823]]
 * lock 3km Michelson

----

= LCGT Commissioning plan (As of Aug 2012) =
Line 9: Line 173:

The List is [[/ItemList|Here]].
The List is [[KAGRA/Subgroups/MIF/Commissioning/ItemList|Here]].

iKAGRA Commissioning

Commissioners at the site

http://densuke.biz/list?cd=wgUxhq6KHdfsUnWW

TO DO before Apr 11

  • IMC and MICH Noise budgeting using Simulink NoiseBudget

  • replace EXA end viewport for EX2 camera
  • check anchors and bolts for vacuum tanks
  • open the GVs
  • oplev stability, noise measurements (with mirror fixed)
  • scattering noise investigation
  • PR3 transfer function measurements, noise measurements
  • IMC ASC
  • EX, EY coil balance at higher frequency (~10Hz. Done for DC)
  • Make online calibration model
  • BS Oplev QPD diagonalization, coil balance
  • put the PMC control back to remote mode
  • stabilize IMC lock

TO DO before Mar 26

  • insert PR2-BS duct B) Done

  • evacuate IXA and IYA (we do not evacuate anything in March)
  • IOO cabling check (?)
  • get PMC back to remote control mode (To be done by Apr 11)
  • coil balancing for BS, ETMX, ETMY B) Done except BS

  • coil offload with picomotors for BS, ETMX, ETMY (and PR3 yaw) B) Done

  • oplev damping for BS, ETMX, ETMY, PR3 B) Done

  • more alignment to maximize contrast, clipping investigation B) Done, 75%MAX

  • measure power at REFL port from X and Y arms B) Done

  • install REFL camera (steal IMMT1T camera) B) Done

  • check LSC model B) Done

  • lock Michelson and measure openloop transfer function B) Done

  • MICH guardian B) Done

  • calibration model (Partially Done)
  • get strain spectrum (Done one shot, done for offline)

Initial alignment work

first week

  • Feb 24 (Wed): Miyakawa, Kokeyama, Aso
    • PR2 install (Aso et al) B) DONE

    • PR3 install (Shoda et al)
  • Feb 25 (Thu): Miyakawa, Kokeyama, Aso
    • PR3 install (Shoda et al) B) DONE

    • oplev and camera for ETMX (Akutsu,Kokeyama) B) DONE (not calibrated yet)

  • Feb 26 (Fri): Miyakawa, Kokeyama
    • PR3 install, check signals (Shoda et al) B) DONE

    • install X end machines (Kokeyama) B)  DONE

    • oplev and camera for ETMY (Akutsu,Simon) B) DONE (not calibrated yet)

  • Feb 27 (Sat): Kokeyama, Akutsu
    • install Y end machines (Kokeyama) B) DONE

    • EY camera (Kokeyama) B) DONE

  • Feb 28 (Sun):
  • Feb 29 (Mon): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Akutsu, Aso
    • IMC stabilization (Kawamura,Enomoto)
    • finish IMMT1T QPD setup (Akutsu,Michimura,Kataoka) B) DONE

    • prepare for IXC+IXA vent (Kimura)
    • peel PR3 first contact (Shoda,Fujii) B) DONE

    • check PR2 picomotors (Aso,Miyo) B) DONE

    • EX camera (Kokeyama) B) DONE

    • install PR2 viewport for the camera, and the camera (Akutsu,Kokeyama) half done (no camera yet)

  • Mar 01 (Tue): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka, Akutsu, Aso
    • turn on PR3 local damping (Shoda,Okutomi,Fujii) B) DONE

    • pedestals for PDs (Michimura,Tomaru) B) ARRIVED

  • Mar 02 (Wed): Miyakawa, Kokeyama, Michimura, Enomoto, Akutsu, Aso, Furuhata, Kambara
    • put PRM-PR3 bellows (MIRAPRO 8:00-11:00) B) DONE

    • put BS-IXC bellows (MIRAPRO PM?) B) DONE

    • IMC stabilization (Kawamura,Enomoto)
    • IXC+IXA vent (Kimura) B) DONE

    • finish IXA clean booth clean up, bring clean goods (Kimura,Tomaru) B) DONE

    • peel ETMX first contact and set coils (Ohishi,Shoda,Aso) REMAINING ISSUE
    • install BS viewports for the oplev and the camera(Akutsu,Michimura,Kambara,Furuhata) half done (45deg issue, IPC issue)

    • install PR3 viewport for the camera, and the camera (Akutsu,Shoda,Okutomi,Fujii) half done (no camera yet)

    • k1cam0 and k1cam1 setup (Kokeyama) B) DONE

    • DAQ networks for EX and EY (Miyakawa,Kokeyama) B) DONE

    • calibrate PR3 oplev (Shoda,Okutomi,Fujii) B) DONE

  • Mar 03 (Thu): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Akutsu, Aso, Furuhata, Kambara
    • high power IMC (Enomoto) B) DONE (~850 mW)

    • PR2 alignment, beam profiling at PR3 half done (beam profiling not yet)

    • check IMMT2 picomotor (Miyo,Doi) B) DONE

    • ETMX,ETMY,BS picomotor (Miyo) B) mostly DONE (ETMX to be confirmed)

    • setup PDs at EXA (Akutsu,Fujii) B) DONE

    • peel ETMY first contact and set coils (Ohishi,Takahashi) B) DONE

    • PR2, PR3, BS, IMMT1T cameras (Kokeyama) PR2 DONE, BS and PR3 to be done
    • ETMX first contact issue: WE DECIDED TO GO WITH REMAINING FIRST CONTACT
  • Mar 04 (Fri): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Furuhata, Kambara
    • PR3 rough alignment into IXA (Michimura,Ushiba,Kuwahara,Okutomi,Kambara,Furuhata) B) DONE (beam profiling at IXA not yet)

    • DQ channels for EXA EYA PDs (Kokeyama) B) Done

    • fix IPC errors (Miyakawa, Kokeyama) B) Done

    • open BS-IXC GV (Saito,Uchiyama,Kimura) B) DONE

    • place ND filters to MC_REFL and PMC_TRANS cameras, and check ghost beams (Enomoto) B) DONE (decreased power to ~250 mW)

  • Mar 05 (Sat): Kokeyama, Kataoka
    • sweep PR3 and wait for end PDs to get any signal (automatically or Kataoka?) NO SUCESS

    • Swap picomotor network switch and install new pico switch on IOO rack (Kataoka, Kokeyama)
    • Install the second camera POE switch on PR2 rack (Kataoka, Kokeyama) B) DONE

    • Set RFM card to k1ioo chassis (Kokeyama) B) DONE

  • Mar 06 (Sun): Kataoka
    • block PSL beam for VAC work (Uchiyama)

second week

  • Mar 07 (Mon)
    • beam clipping at BS check, BS rough alignment into Y, IXA beam check with respect to PR3 alignment, beam profiling at IXA?, sweep PR3 at night (Michimura,Ushiba,Kataoka,Kambara,Furuhata,Okutomi)
    • check ETMX actuation (Ohishi,Takahashi) B) DONE

    • calibrate ETMX oplev (Kuwahara) B) DONE

    • ETMX picomotor check (Miyo) B) DONE

    • install EXA end flange (Tomaru) B) DONE

    • calibrate ETMY oplev (Kokeyama,Kuwahara) B) DONE

    • PR3 oplev calibration result, check PR3 oplev channels (Kokeyama,Okutomi) B) DONE

    • RFM test between center area and both ends (Kokeyama)
  • Mar 08 (Tue)
    • install BS oplev and calibrate (Akutsu,Hasegawa,Kuwahara) B) DONE

    • fine adjustment of PR3 alignment to BS and IXA, Xarm viewport, PR3 sweep to EXA (Michimura,Shoda,Okutomi,Ushiba,Furuhata,Kagawa,Fujisawa) B) DONE

    • install EXA end viewport (Akutsu,Hasegawa,Kuwahara) B) DONE

    • check ETMY actuation (Ohishi,Takahashi,Kuwahara) B) DONE

    • install EYA end flange (Kimura,Tomaru) B) DONE

    • VIS guardian (Shoda,Okutomi,Kokeyama) B) DONE

  • Mar 09 (Wed)
    • BS actuation check (Ushiba,Kuwahara,Furuhata) B) DONE

    • setup PD at EYA (Akutsu,Hasegawa,Kambara) B) DONE

    • install EYA end viewport (Akutsu,Hasegawa,Kambara) B) DONE

    • take PD from EXA, EXA beam check, ETMX rough alignment (Michimura,Fujii) B) DONE, DONE

    • setup PD at BS (Akutsu,Hasegawa,Kambara) B) DONE

    • EXA end, EYA end cameras (Kokeyama) B) DONE

    • RFM network between center and Yend (Kokeyama) B) DONE

  • Mar 10 (Thu)
    • connect BS-IYC (MIRAPRO) B) DONE

    • start EXA evacuation (Kimura) B) DONE

    • block Y arm beam (Akutsu,Kambara,Hasegawa) investigated

    • LED from EYA to BS (Miyoki) failed -> try brighter LED

  • Mar 11 (Fri)
    • connect PR2-PR3 duct (MIRAPRO) B) DONE

    • sweep ETMX and wait for AS PD to get any signal (Miyo,Hasegawa)
    • sweep BS and wait for ETMY PD to get any signal (Fujii,Furuhata)
  • Mar 12 (Sat)
    • partially connect PR2-BS duct (MIRAPRO)
    • LED from EYA to BS (Tomaru,Uchiyama,Hasegawa,Miyo) failed
  • Mar 13 (Sun)
    • BS PD to face X (Uchiyama) B) DONE

third week

  • EXA vent (Saito,Tomaru) B) DONE

  • ETMX alignment re-adjustment (Uchiyama) B) DONE

  • viewport for IXA (Michimura) B) DONE

  • BS alignment re-adjustment (Uchiyama?) B) DONE

  • ETMY oplev re-calibration B) DONE

  • IYA vent (Kimura?) B) DONE

  • get the beam back to IFI and then to REFL B) DONE

  • set up REFL optics and cabling B) DONE

  • beam to and from X and Y arms B) DONE

What we do

  • confirm mirror actuators (picomotors, coils, OSEMs) work from digital system
  • prepare oplevs and cameras
  • prepare RT models and MEDM screens for mirrors and LSC
  • prepare feet for large beam profiler
  • prepare pedestals for DC PDs
  • REFL optics
  • stable operation of IMC
  • initial alignment: JGW-T1604823

  • lock 3km Michelson


LCGT Commissioning plan (As of Aug 2012)

Schedule

  • List up issues to be addressed for installation procedure (September)
  • Detailed installation plan (October)
  • General Commissioning Strategy (how to deploy man power etc) (by the end of November)

List of items necessary for commissioning