Line 2: Line 2:
== Travel Plan == == Commissioners at the site ==
Line 25: Line 25:
== Initial Alignment == == What we do ==
 * confirm mirror actuators (picomotors, coils, OSEMs) work from digital system
 * prepare oplevs and cameras
 * prepare RT models and MEDM screens for mirrors and LSC
 * prepare feet, pedestals for large beam profiler and DC PDs
 * REFL optics
 * stable operation of IMC
 * initial alignment: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4823|JGW-T1604823]]
 * lock 3km Michelson

iKAGRA Commissioning

Commissioners at the site

  • Feb 24 (Wed): Miyakawa, Kokeyama
  • Feb 25 (Thu): Miyakawa, Kokeyama
  • Feb 26 (Fri): Miyakawa, Kokeyama
  • Feb 27 (Sat): Kokeyama
  • Feb 28 (Sun):
  • Feb 29 (Mon): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka
  • Mar 01 (Tue): Miyakawa, Kokeyama, Michimura, Enomoto, Kataoka
  • Mar 02 (Wed): Miyakawa, Kokeyama, Michimura, Enomoto
  • Mar 03 (Thu): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara
  • Mar 04 (Fri): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara
  • Mar 05 (Sat): Kokeyama, Kataoka
  • Mar 06 (Sun): Kataoka
  • Mar 07 (Mon): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Kataoka
  • Mar 08 (Tue): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara, Kataoka
  • Mar 09 (Wed): Miyakawa, Kokeyama, Michimura, Enomoto, Ushiba, Kuwahara
  • Mar 10 (Thu): Miyakawa, Kokeyama, Michimura, Enomoto
  • Mar 11 (Fri): Miyakawa, Kokeyama, Michimura, Enomoto
  • Mar 12 (Sat): Kokeyama
  • Mar 13 (Sun):
  • Mar 14 (Mon): Miyakawa, Kokeyama
  • Mar 15 (Tue): Miyakawa, Michimura

What we do

  • confirm mirror actuators (picomotors, coils, OSEMs) work from digital system
  • prepare oplevs and cameras
  • prepare RT models and MEDM screens for mirrors and LSC
  • prepare feet, pedestals for large beam profiler and DC PDs
  • REFL optics
  • stable operation of IMC
  • initial alignment: JGW-T1604823

  • lock 3km Michelson


LCGT Commissioning plan (As of Aug 2012)

Schedule

  • List up issues to be addressed for installation procedure (September)
  • Detailed installation plan (October)
  • General Commissioning Strategy (how to deploy man power etc) (by the end of November)

List of items necessary for commissioning

The List is Here.