O4 Commissioning Task List

This is a list of things to do for each commissioning stage for O4.

Each stage include ASC.

References

Preparations

Xarm

Yarm

Michelson

Power recycling cavity

Signal recycling cavity

Dual Recycled Michelson

Fabry-Perot Michelson

* Repeat the same measurements as described in

Power Recycled Fabry-Perot Michelson

Resonant Sideband Extraction