Size: 281
Comment:
|
← Revision 8 as of 2020-04-05 23:59:43 ⇥
Size: 2142
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* Purpose | * Purpose * The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run. * There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on. * We want to start the discussion how to clean the KAGRA ground. |
Line 5: | Line 8: |
* Meeting information * |
* Pick up the topics * Where/How/What ground should be prepared? * Requirement from AEL and DGS group * Requirement from Laser * Requirement from MIF (PDs, optical tables, …) * Requirement from Suspension and payload * Requirement from FCL, VAC and PEM * etc * meeting style * 30min Japanese meeting for instrument * 30min English meeting for interferometer * 目的 * KAGRAの複雑なグランドは、将来の観測に不安を残している * PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している * topics of discussion * どこに、どうやって、どのようなKAGRA グランドを用意するのか * 回路やデジタルグループからの要求や相談 * レーザーグループからの要求や相談 * 干渉計グループからの要求や相談(PDや光学定盤に関してなど) * サスペンション・ペイロードからの要求や相談 * FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求 * その他 * Meeting style * 最初の30分を日本語で主に設置に関することを議論し * 後半の30分を英語で主に干渉計に関することを議論したいと思います。 * Meeting information |
Line 10: | Line 42: |
||1||2020/2/28||[[KAGRA/Subgroups/PEM/Meeting/200228/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/Meeting/200228/Minute|Minute(JP)]]|| || | ||2||2020/04/08 10:00-11:00||[[KAGRA/Subgroups/PEM/GNDmeeting/200408/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200408/Minute|Minute]]|| Make todo list || ||1||2020/03/05 13:00-14:00||[[KAGRA/Subgroups/PEM/GNDmeeting/200305/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200305/Minute|Minute]]|| kick-off meeting ([[KAGRA/Subgroups/PEM/GNDmeeting/200305/KIMURA|Kimura-san report]])|| |
GND meeting
- Purpose
- The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
- There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
- We want to start the discussion how to clean the KAGRA ground.
- Pick up the topics
- Where/How/What ground should be prepared?
- Requirement from AEL and DGS group
- Requirement from Laser
- Requirement from MIF (PDs, optical tables, …)
- Requirement from Suspension and payload
- Requirement from FCL, VAC and PEM
- etc
- meeting style
- 30min Japanese meeting for instrument
- 30min English meeting for interferometer
- 目的
- KAGRAの複雑なグランドは、将来の観測に不安を残している
- PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している
- topics of discussion
- どこに、どうやって、どのようなKAGRA グランドを用意するのか
- 回路やデジタルグループからの要求や相談
- レーザーグループからの要求や相談
- 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
- サスペンション・ペイロードからの要求や相談
- FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
- その他
- Meeting style
- 最初の30分を日本語で主に設置に関することを議論し
- 後半の30分を英語で主に干渉計に関することを議論したいと思います。
- Meeting information
Zoom2 : https://zoom.us/j/6676627462
No. |
Date |
Agenda |
Minute |
Files |
2 |
2020/04/08 10:00-11:00 |
Make todo list |
||
1 |
2020/03/05 13:00-14:00 |
kick-off meeting (Kimura-san report) |