Weekly PEM meeting
- 2019/6/25(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue
- Installation of the 1st PEM toward the O3 was (almost) completed!!
- Center area, X end, Y end, weather station
- Remaining : Magnetometer!!!
- 2nd PEM installation will be started after the characterization of the chambers. (After O3??)
Washimi PEM webpage URL
- PEM map provided by the medm was updated.
- The power supply status measurements will be (re-)start soon
- With the discussion with the Facility
- Task list toward the O3
- Please send e-mail to me if you have comments.
- Engineering run
- 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
- What should we do toward the next engineering run
- KIW6
- Washimi-san and Kaihotsu-san presented
- Currently, I heard that PEM activity is great! This is good news.
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
- Seismon issue
- We already installed to KAGRA system
- Need the tuning for the KAGRA
- Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
- Yuzu summary page was upgraded!
- There will be a report in the each member progress
- One student (Yikang) will come to KAGRA and work with PEM group
- Last his visiting was cryo issue
- Magnetometer and shaker injection (?)
- Installation of the 1st PEM toward the O3 was (almost) completed!!
- each member progress
- Yokozawa
- Coherent analysis during the engineering run
- Washimi 
- New accelerometer
- plan for cryochamber characterization
- other
- Kozakai
- Trigger rate analysis during engineering run
- Collaboration with Yuzu summary page
- Miyo
- Effect the protect shied to the seismometer
- Long term study of the KAGRA ground motion
- Oshino
- Weather station issue
- TTanaka(may not attend this meeting)
Preparing for the PEM injection pdf
- Microphone calibration
- Okutomi
- Shaker injection
- Kaihotsu
- Report about the KIW6
- Yuzurihara
- Yuzu summary page
- etc
- Yokozawa
- github progress