* What should we do toward the next engineering run | |
Line 35: | Line 36: |
* One student (Yikang) will come to KAGRA and work with PEM group * Last his visiting was cryo issue * Magnetometer and shaker injection (?) |
|
Line 38: | Line 42: |
* Yokozawa * Coherent analysis during the engineering run |
|
Line 39: | Line 45: |
* PEM with Virgo : * End station PEMs (X-end) : see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9018]]. MEDM of EX0 is also updated. * Power supply |
* New accelerometer * plan for cryochamber characterization * other |
Line 43: | Line 49: |
* Trigger rate analysis during engineering run * Collaboration with Yuzu summary page |
|
Line 44: | Line 52: |
* Future ground motion ealuation, especially around cryostat. | * Effect the protect shied to the seismometer * Long term study of the KAGRA ground motion * Oshino * Weather station issue |
Line 46: | Line 57: |
* PEM with Virgo | * Preparing for the PEM injection |
Line 48: | Line 59: |
* Okutomi * Shaker injection |
|
Line 49: | Line 62: |
* Additional measurements | * Report about the KIW6 |
Weekly PEM meeting
- 2019/6/25(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue
- Installation of the 1st PEM toward the O3 was (almost) completed!!
- Center area, X end, Y end, weather station
- Remaining : Magnetometer!!!
- 2nd PEM installation will be started after the characterization of the chambers. (After O3??)
Washimi PEM webpage URL
- PEM map provided by the medm was updated.
- The power supply status measurements will be (re-)start soon
- With the discussion with the Facility
- Task list toward the O3
- Please send e-mail to me if you have comments.
- Engineering run
- 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
- What should we do toward the next engineering run
- KIW6
- Washimi-san and Kaihotsu-san presented
- Currently, I heard that PEM activity is great! This is good news.
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
- Seismon issue
- We already installed to KAGRA system
- Need the tuning for the KAGRA
- Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
- Yuzu summary page was upgraded!
- There will be a report in the each member progress
- One student (Yikang) will come to KAGRA and work with PEM group
- Last his visiting was cryo issue
- Magnetometer and shaker injection (?)
- Installation of the 1st PEM toward the O3 was (almost) completed!!
- each member progress
- Yokozawa
- Coherent analysis during the engineering run
- Washimi
- New accelerometer
- plan for cryochamber characterization
- other
- Kozakai
- Trigger rate analysis during engineering run
- Collaboration with Yuzu summary page
- Miyo
- Effect the protect shied to the seismometer
- Long term study of the KAGRA ground motion
- Oshino
- Weather station issue
- TTanaka
- Preparing for the PEM injection
- Microphone calibration
- Okutomi
- Shaker injection
- Kaihotsu, Mori
- Report about the KIW6
- etc
- Yokozawa
- github progress