Minute of PEM meeting
- Date: 2019/7/24 17:00-18:00(JST)
- Attend:Oshino, Yamat, TTanaka, Washimi, Kozakai, Fujikawa, Kaihotsu, Mori
Agenda
- General issue
- KAGRA F2F meeting
- Yokozawa(Status), Washimi(Reports)
- Welcome to have many posters
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Magnetometers
- Two Bartington Mag-13MCL100 in the PEM rack
- Three high sensitivity mini magnetometer (MI-CB-1DH-S-B, two for magnetic field gradient, one for Yikang study)
- Task list toward the O3
- Please send e-mail to me if you have comments.
- Kamioka visitors
- Yikang-san (8/5 - 8/17)
- Yokoyama-san (8/6)
- Fujikawa-san and Tanaka-san (8/18 - 8/31)
- Ueshimi-san (??)
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Yikang, Yokozawa)
- RF injection (TTanaka, Washimi)
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Power supply, duct vibration, instruments
- Cable noise study, Yend Magnetometer install, Clean up the IXC rack(7/26)
- Cable noise study, IXC vibration study, Xend PCAL RxPD noise budget (8/2)
- Virgo visiting
- We will start the discussion to visit Virgo at October
- Washimi(noise huntung with portable PEM), Miyo(ground motion)
English meeting : The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
- 3rd meeting will be held at 20th Aug.(Tue) 17:00-18:00 URL
- Weather alert
- Alert to the IFO
- Daily weather report
- KAGRA F2F meeting
- Each progress
- Yokozawa
- Coherent analysis with PEMs
- Vacuum pump vibration and sound environment and its effect
- 312.5Hz noise
- Washimi
- Cryochamber characterization
- After IXC vibration
- Sound reverberation analysis
- Large statistics
- Kaminari monitoring
- Seismometer vs accelerometer analysis :
- EYC MAG
- Finish the installation
- PEM MAP update
- with summary page
- Cryochamber characterization
- Kozakai
- Trigger event identification
- Yuzu summary page update (Figure image size)
- update the 7/13
- K1:LSC-POP_PDA17...
- reduced the image size
- Yuzu CBC analysis
- Consistency glitch search check
- PSL noise hunting
- Miyo
- Effect the protect shied to the seismometer
- Ground motion at 7/19 (ダム?)
Y > CS > X
- トンネルのドームかも
- Alert system by threshold analysis
- Feedforward progress (This task is not PEM task, but I want to ask you to present a short status if there is)
- TTanaka
- Preparing for the PEM injection
- Analysi of the PEM injection during 2nd engineering run
- BNC noise evaluation
- Okutomi
- Shaker injection
- Kaihotsu, Mori
- Reports of the weekly PEM measurements
- Yuzurihara
- Yuzu summary page comments
- etc
- Yokozawa
- github progress