Line 1: Line 1:
TTanaka, Kaihotsu, Mori, kozakai, Washimi TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa

 * PSL44Hz
 * Can remove this effect. Move the 24V power supply to ouutside of the PSL room.
Portable1 acc moved to white laser lack.

 * ISS cover check
 * Check the portable acc, but not detected the serious noise, reject the candidate from optical table

 * Discussion about the lightning monitor at 12th Sep.
 * monitoring the MAX/MIN magnetometer time series monitoring
 * There are lightning candidate around the evening
 * Full sampling rate time series monitoring
 * correlation between BS oplev was observed only 5th Aug.
 * PEM injection T~e-9 but 5thAug is e-6 level
 * Need very large coil
 * If we use the frame, we can make larger magnetic field
 *

TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa

  • PSL44Hz
  • Can remove this effect. Move the 24V power supply to ouutside of the PSL room.

Portable1 acc moved to white laser lack.

  • ISS cover check
  • Check the portable acc, but not detected the serious noise, reject the candidate from optical table
  • Discussion about the lightning monitor at 12th Sep.
  • monitoring the MAX/MIN magnetometer time series monitoring
  • There are lightning candidate around the evening
  • Full sampling rate time series monitoring
  • correlation between BS oplev was observed only 5th Aug.
  • PEM injection T~e-9 but 5thAug is e-6 level
  • Need very large coil
  • If we use the frame, we can make larger magnetic field