Size: 78
Comment:
|
Size: 760
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* PSL44Hz * Can remove this effect. Move the 24V power supply to ouutside of the PSL room. Portable1 acc moved to white laser lack. * ISS cover check * Check the portable acc, but not detected the serious noise, reject the candidate from optical table * Discussion about the lightning monitor at 12th Sep. * monitoring the MAX/MIN magnetometer time series monitoring * There are lightning candidate around the evening * Full sampling rate time series monitoring * correlation between BS oplev was observed only 5th Aug. * PEM injection T~e-9 but 5thAug is e-6 level * Need very large coil * If we use the frame, we can make larger magnetic field * |
TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa
- PSL44Hz
- Can remove this effect. Move the 24V power supply to ouutside of the PSL room.
Portable1 acc moved to white laser lack.
- ISS cover check
- Check the portable acc, but not detected the serious noise, reject the candidate from optical table
- Discussion about the lightning monitor at 12th Sep.
- monitoring the MAX/MIN magnetometer time series monitoring
- There are lightning candidate around the evening
- Full sampling rate time series monitoring
- correlation between BS oplev was observed only 5th Aug.
- PEM injection T~e-9 but 5thAug is e-6 level
- Need very large coil
- If we use the frame, we can make larger magnetic field