Size: 760
Comment:
|
Size: 1194
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa | TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa, Kokeyama |
Line 18: | Line 18: |
* Omicron was unstable now * Development the spectrogram tool * Enkaku injection project * IFIとPR2付近の真空ポンプの振動を調べた * PR2のドライポンプはそもそもノイズレベルが大きい * コントローラは確認したか? * Fujikawa+Mori * Extract the line peak * Implementing the various noises * Earthquake vs lockloss * check by the MCF seismometer |
TTanaka, Kaihotsu, Mori, kozakai, Washimi, Fujikawa, TTanaka, Miyoki, Ohkawa, Kokeyama
- PSL44Hz
- Can remove this effect. Move the 24V power supply to ouutside of the PSL room.
Portable1 acc moved to white laser lack.
- ISS cover check
- Check the portable acc, but not detected the serious noise, reject the candidate from optical table
- Discussion about the lightning monitor at 12th Sep.
- monitoring the MAX/MIN magnetometer time series monitoring
- There are lightning candidate around the evening
- Full sampling rate time series monitoring
- correlation between BS oplev was observed only 5th Aug.
- PEM injection T~e-9 but 5thAug is e-6 level
- Need very large coil
- If we use the frame, we can make larger magnetic field
- Omicron was unstable now
- Development the spectrogram tool
- Enkaku injection project
- IFIとPR2付近の真空ポンプの振動を調べた
- PR2のドライポンプはそもそもノイズレベルが大きい
- コントローラは確認したか?
- Fujikawa+Mori
- Extract the line peak
- Implementing the various noises
- Earthquake vs lockloss
- check by the MCF seismometer