Weekly PEM meeting
- 2019/10/01(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
Agenda
- General issue
- Interferometer status
- Several morning runs were held. They are silent run after the IFO commissioning.
- We can use the PEM injection and calibration line study in future
See the detail in url
Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection
- Current urgent noise
- Several morning runs were held. They are silent run after the IFO commissioning.
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Start writing paper (PTEP?)
- There are many project to collaborate with the instruments
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- RF injection (TTanaka, Washimi)
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Power supply, duct vibration, instruments
- Tentative : Magnetic field and its injection
Virgo visiting github
- We will start the discussion to visit Virgo at October
- Washimi, Sugimoto(noise huntung with portable PEM)
Virgo-KAGRA meeting -> Tomorrow
- 9/29-10/13
- Database for the KAGRA characteristic lines
- Interferometer status
- Each progress
- Yokozawa
- Coherent analysis for the FPMI, MICH and SRCL
- Vacuum duct vibration analysis
- SR3 oplev vibration
- Washimi, Sugimoto 
- Virgo visiting
- Kozakai
- Trigger analysis with silent run
- TTanaka
Preparing for the PEM injection pdf
- Miyo
- Seismic motion issue if there is topic
- Okutomi
- Shaker injection
- Mori, Fujikawa
SR's vibration pdf
- Fujimopy
- Lockloss with earthquake
- Yuzurihara
- Yuzu summary page comments
- Yamamoto
Auto Bruco klog10203
- etc
- Yokozawa
- github progress