Differences between revisions 1 and 2
Revision 1 as of 2019-09-30 03:25:06
Size: 3780
Comment:
Revision 2 as of 2019-09-30 03:30:22
Size: 2879
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
    * Current urgent noise [[attachment:PEM_working_list_190916.pdf|pdf]]     * Current urgent noise
Line 27: Line 27:
    * --(SR3, serious 16Hz noise investigation)--     * --(SR3, serious 17Hz noise investigation)--
    * Wide 44Hz noise
Line 29: Line 30:

  * Task list toward the O3
   * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]]
   * Please send e-mail to me if you have comments.
Line 38: Line 35:
   * magnetic field injection (Niigata Tanaka, Yokozawa)    * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
Line 45: Line 42:
   * Tentative : Vacuum duct vibration measurement    * Tentative : Magnetic field and its injection
Line 52: Line 49:
   * Task list [[attachment:VIR-0887A-19.pdf.pdf|task]]

  * [[KAGRA/Subgroups/PEM/EnMeeting|English meeting]] : The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
   * 4th meeting will be held at 25th Sep.(Wed) 17:00-18:00 URL

  * Measured PEM summary
   * Commissionar asked us to open the measured PEM data
Line 71: Line 61:
  * Washimi 
   * Magnetic field simulation and lighting issue : [[http://10.68.10.87/~controls/KamioKaminari/]]
   * Sound reverberation analysis : [[https://github.com/gw-pem/kagra-pem/issues/152]]
     * Remeasurement @ Y-arm
     * Analysis on Chromebook (for the measurement @ Virgo)
   * Prepare for Virgo visiting
  * Washimi, Sugimoto 
   * Virgo visiting
Line 79: Line 65:
   * iKozapy    * Trigger analysis with silent run
Line 90: Line 76:
  * Kaihotsu, Mori
   * SR's vibration[[attachment:sr_sride.pdf|pdf]]
  
  * Fujikawa, Mori
   * Fujimopy[[attachment:fmpy|fmpy]]

  * Fujikawa
  * Mori, Fujikawa
   * SR's vibration
   * Fujimopy

Weekly PEM meeting

  • 2019/10/01(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

Agenda

  • General issue
    • Interferometer status
      • Several morning runs were held. They are silent run after the IFO commissioning.
        • We can use the PEM injection and calibration line study in future
        • See the detail in url

        • Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

        • Current urgent noise
    • Chrome Book project (Portable PEM researcher)
      • http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable

      • We prepared two PEM Chromebook
      • Start writing paper (PTEP?)
      • There are many project to collaborate with the instruments
        • IOO, vibration, sound and magnetometer measurements inside the PSL room klog10173, list

        • ALS, the green fiber noise
        • LAS, ISS noise hunting
        • MIF, FPMI displacement
        • VIS, Around the OpLev

        • SR3, serious 17Hz noise investigation

        • Wide 44Hz noise
        • BS , Serious 90Hz noise investigation
    • PEM injection
      • Shaker injection1 (TTanaka, Yokozawa)
      • Shaker injection2 (Okutomi, Fabian)
      • acoustic injection (TTanaka, Yokozawa)
      • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
      • RF injection (TTanaka, Washimi)
    • Weekly PEM measurement
      • Friday is weekly PEM measurement
      • Understanding the effect of the instruments, search the origin of noise, and so on
      • Power supply, duct vibration, instruments
      • Tentative : Magnetic field and its injection
    • Virgo visiting github

      • We will start the discussion to visit Virgo at October
      • Washimi, Sugimoto(noise huntung with portable PEM)
      • Virgo-KAGRA meeting -> Tomorrow

      • 9/29-10/13
    • Database for the KAGRA characteristic lines
  • Each progress
    • Yokozawa
      • Coherent analysis for the FPMI, MICH and SRCL
      • Vacuum duct vibration analysis
      • SR3 oplev vibration
    • Washimi, Sugimoto 
      • Virgo visiting
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka
      • Preparing for the PEM injection
    • Miyo
      • Seismic motion issue if there is topic
    • Okutomi
      • Shaker injection
    • Mori, Fujikawa
      • SR's vibration
      • Fujimopy
      • Lockloss with earthquake
    • Yuzurihara
      • Yuzu summary page comments
    • Yamamoto
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/191001/Agenda (last edited 2019-10-03 15:07:44 by taiki.tanaka)