Minute of PEM meeting (English ver.)
- Date: 2019/11/05 17:00-18:00(JST)
- Attend:Yokozaqwa, TNTanaka, Fujikawa, Ohkawa, Washimi, Mori, Kozakai, Yamada, Akutsu, Kaihotsu
Agenda
- General issue
- PTEP paper
- [kagra 03133]
- KAGRA Overview papers
- Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
- Next F2F meeting
- RESCEU
- 4th and 5th Dec., 2019
- 1 slot Washimi-san will have a talk
- If you plan to write master/doctor thesis, please let me know
- Master thesis : TTanaka(ICRR)
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Start writing paper (PTEP?)
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
Shaker injection2 (Okutomi, Fabian) -> After O3
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
RF injection (TTanaka, Washimi) -> After O3
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz), FFU, Noise search
- Database for the KAGRA characteristic lines
- NoEMi
- Visitors from LVK
- Anamaria from Livingston : 18 - 29 Nov.
- Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
- We will ask them about the status talk of the commissioning break and reviewer
- Fujikawa, TNTanaka 11/24-12/3
- Each progress
- Yokozawa
- Current serious noises
- 24Hz noise (100V AC + AA?)
- We connect/disconnect the GND JP in the AA chassis, but could not understand
- MICH control noise
- Add the noise projection of the MICH control noise
- Coherent with ITMX MN YAW
- Wait for the noise budget of the Type-A control
- Coherence with ITMY TM PIT
- Wait for the noise budget of the Type-A control
- 24Hz noise (100V AC + AA?)
- Daily summary page
- Update PEM, VIS, FPMI part
- Current serious noises
- Washimi
- Summary of coherence study between PEMs and DARM displacement
Calculated the coherence between DARM displacement and PEM channels for long locked data (>1h, 500average)
- We can see the coherence between DARM and EXC MAG Y at 11Hz, but we couldn't see peak when he went to end station, coincidence with LOCK status?
- Coherence with PCal RxPD at 1.3Hz, ETMY gas excitation made the large oscillation, Pcal detected as long oplev
- 24Hz is serious rack noise
- 44,45Hz Compressor or FFU?
Compressor sound make44Hz, 46Hz and 56Hz -> stop during observation, check the coherence with FPMI signal
- The 60Hz peak of the EXC MAG is larger than other MAG, this imply the dark GND at Xend station
- It turned out acoustic noise search inside the PSL is difficult, we prepared the multiple microphone and see the data at the same time.
- laser amp made the ~110Hz vibration and injected to the noise, similar path with 24V power supply vibration(white rack)
- 840Hz IMC refl
- We need to classify the Priority to the noises, it is different between identification and hunting
- Summary of coherence study between PEMs and DARM displacement
- Washimi, Yamada, TTanaka
IXC vibration -> See the Yamada-san's slide
- Identify the origin of the frequency noise
- 42Hz is resonant frequency of the pylon
44Hz Whimsical compressor -> checked by them
- 46.125Hz
54.125Hz Whimsical compressor -> checked by them
- 58 sound origin?
- Some peaks were grow up by the acoustic injection, due to the scattered light?
- There is data which can take coherence between DARM and accelerometers which were placed in the IXC chamber
- There is some coherence between DARM and MIC at center area, there is no coherence with end mic
There is coherence with ITMX MN P <20Hz
- There is coherence at 46Hz between DARM and ACC at the TM oplev table, this is some hint for 46Hz noise
- Also MIC at 46Hz
- We want to check the condition with various air compressor
- Kozakai
- Trigger analysis with silent run
- Auto process was run when we can take the silent run, the glitch plots were generated for the long silent run, please check the Yuzu summary page
- glitch plot catalog
- There is coincidence between large glitch and magnetometers and/or seismometers, suspension jump.
Fabian requested that there is coincidence between OL jump and glitch -> check later
- TTanaka(ICRR), Washimi, TTanaka(Niigata), Yamada
- Acoustic injection with FPMI
- No report in this meeting
- Mori, Nakayama
- Vacuum pump vibration
- They stopped six vacuum pump(dry、turbo) at the center area(BS) at last Friday, they didn't stop the ion pumps, ion pumps will not be stopped during observation.
- Compared the vibration between turbo pump on and off
- Pressure value became twice worse, but there is no serious problem, this imply the outer gas is not so large
- New low vibration vacuum pump characterization
- They summarized the vibration and sound from the vacuum pumps
- The behavior of the noise floor at 200Hz is interested、the floor in case of the OFF is larger than in case of the ON, 214Hz and 216Hz
- Fujikawa, Mori
- fujimopy
- Peak identification for the two cases (ex: pump on/off)
- Average is important to reduce the statistical error
- Available from the diaggui
- html viewpage in the ICRR computer : change 40-50Hz to 7-11Hz?
- Peak identification for the two cases (ex: pump on/off)
- Line amplitude web page
- fujimopy
- Fujikawa, Washimi
- Lock loss study
root histogram-> gauss fitting and check the significance->Easy identification of the lock loss
Lock loss due to the IXC acoustic injection->pulse like injection or excitation?
- Stat the investigation for the lock loss of the FPMI
- Lock loss study
- TTanaka(Niigata)
- Preparation of the coil
- 24Hz noise situation
- Made the coil driver for the PEM injection
- Discussed about his thesis and MAG injection
- etc
- Yokozawa