General issue
- Interferometer status
- December 17-24 24h engineering run
- We also held the post ER. We turned off the FFUs and vacuum pumps
- Lock acquisition to PRFPMI
- There is still some peaks in the lower frequency
Type-A resonant frequency JGWDoc11116
- Peaks appeared at higher frequency
- PEM injection to REFL table
- After that, we will move to noise hunting
~100Hz noise and line noise of the higher frequency -> PEM
- December 17-24 24h engineering run
- PEM plan January
- Identification of the ~100Hz noise source
- (Maybe, ) the dominant noise for lower frequency may come from suspension
- After the success of the PRFPMI (or chance to operate the FPMI), we would like to do following things
- Understanding the coupling function detected at the refl table
- At the some point, we detected the larger coupling function
- Periscope or some optics?
- Understanding the coupling function detected at the refl table
- We would like to inject sound or vibration to AS, POP and TMS table
- Long term PEM evaluation
- Identification of the ~100Hz noise source
- PEM festival
- 01/14(Tue) 9:00-15:00
Evaluate the scattered light for payload (with CRY team) http://klog.icrr.u-tokyo.ac.jp/osl/?r=12293
- 01/15(Wed) (Maybe expanded)
- Turned off almost all FFUs and vacuum pumps
- 01/14(Tue) 9:00-15:00
- Conference
地下宇宙若手研究会@茂住 (2/22-24)
- JPS (2020/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- He is writing the thesis
- Newtonian noise measurement
- Thank you for Virgo PEM member!
- Francesca mainly measured the newtonian noise
- We will discuss in 21st. Jan.(Virgo KAGRA PEM meeting)
- PEM measurement
- Someday : Effect of the sound to DARM displacement
- Someday : Environmental check around BS (including the POP)
- Someday : Evaluation of the table cover
- Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
Each progress
- Yokozawa
- Planning toward the O3 run
- Washimi
Preparation for the hammering test @ Y-end klog
Sound reverberation study (KAGRA & Virgo)
- Kozakai
- Offline detchar report for the part of the PEM
- TTanaka(ICRR)
shaker injection with FPMIspeaker@12/8,shaker@12/15
Master thesisthesis
- Fujikawa
- Lock loss study2
- fujimopy
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc