Size: 295
Comment:
|
Size: 2225
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Virgo-KAGRA PEM meeting == * 2020/01/14(The) 17:00-18:00(JST) 9:00-10:00(CEST) * Zoom2 : https://zoom.us/j/6676627462 |
== Weekly PEM meeting == * 2020/01/28(Tue) 16:00-(JST) * Regular meeting meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) |
Line 5: | Line 6: |
=== Agenda === | |
Line 7: | Line 7: |
* KAGRA PEM reports * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) * Sound revelation time * others |
=== Agenda === ==== General issue ==== * Interferometer status * Finally, we can lock the PRFPMI * Transmittance laser power became 100 times higher than FPMI * Lock duration is about 30min at maximum * OMC commissioning is also ongoing * ~100Hz noise and line noise of the higher frequency -> PEM * New PEMs * We bought the ACO power supply, microphone and accelerometers(end of Feb.) * Basically the portable PEMs * PEM plan * PEM injection to optical table * Hammering test * Long term PEM evaluation * Turning off the instruments * Many microphone in the PSL room * Conference * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]]@茂住 (2/22-24) * JPS (2020/3/16-19 @ Nagoya) * Yokozawa, TTanaka * KIW7 * PEM injection * Shaker injection1 (TTanaka, Yokozawa) * acoustic injection (TTanaka, Yokozawa) * PSL, REFL and AS table injection * Analysis is ongoing * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa) * Effect of the air cooler magnetic field * AS, REFL table injection * He is writing the thesis ==== Each progress ==== * Yokozawa * Planning toward the O3 run * IX. IY microphone * Instrument switch off * Washimi * Preparation for the hammering test @ Y-end [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12497|klog]] * Sound reverberation study (KAGRA & Virgo) * Kozakai * Offline detchar report for the part of the PEM * TTanaka(ICRR) * shaker injection with FPMI[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11117|speaker@12/8]],[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11128|shaker@12/15]] * Master thesis[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|thesis]] * Fujikawa * Lock loss study2 * fujimopy * TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table * etc |
Weekly PEM meeting
- 2020/01/28(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Finally, we can lock the PRFPMI
- Transmittance laser power became 100 times higher than FPMI
- Lock duration is about 30min at maximum
- OMC commissioning is also ongoing
~100Hz noise and line noise of the higher frequency -> PEM
- Finally, we can lock the PRFPMI
- New PEMs
- We bought the ACO power supply, microphone and accelerometers(end of Feb.)
- Basically the portable PEMs
- PEM plan
- PEM injection to optical table
- Hammering test
- Long term PEM evaluation
- Turning off the instruments
- Many microphone in the PSL room
- Conference
地下宇宙若手研究会@茂住 (2/22-24)
- JPS (2020/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- He is writing the thesis
Each progress
- Yokozawa
- Planning toward the O3 run
- IX. IY microphone
- Instrument switch off
- Washimi
Preparation for the hammering test @ Y-end klog
Sound reverberation study (KAGRA & Virgo)
- Kozakai
- Offline detchar report for the part of the PEM
- TTanaka(ICRR)
shaker injection with FPMIspeaker@12/8,shaker@12/15
Master thesisthesis
- Fujikawa
- Lock loss study2
- fujimopy
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc