Size: 315
Comment:
|
← Revision 12 as of 2020-01-28 13:59:39 ⇥
Size: 2676
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Virgo-KAGRA PEM meeting == * 2020/01/14(The) 17:00-18:00(JST) 9:00-10:00(CEST) * Zoom2 : https://zoom.us/j/6676627462 |
== Weekly PEM meeting == * 2020/01/28(Tue) 16:00-(JST) * Regular meeting meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) |
Line 5: | Line 6: |
=== Agenda === | |
Line 7: | Line 7: |
* KAGRA PEM reports * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) * Sound revelation time * others |
=== Agenda === ==== General issue ==== |
Line 12: | Line 11: |
* Each progress | * Interferometer status * Finally, we can lock the PRFPMI * Transmittance laser power became 100 times higher than FPMI * Lock duration is about 30min at maximum * OMC commissioning is also ongoing * ~100Hz noise and line noise of the higher frequency -> PEM * New PEMs * We bought the ACO power supply, microphone and accelerometers(end of Feb.) * Basically the portable PEMs * PEM plan * PEM injection * Shaker injection (TTanaka, Yokozawa) * Acoustic injection (TTanaka, Yokozawa) * PSL, REFL and AS table injection (Defence of TT Thesis -> tomorrow) * magnetic field injection (Niigata TTanaka, Fujikawa, Yokozawa) * Effect of the air cooler magnetic field * AS, REFL table injection * He is writing the thesis * Hammering test * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]] * Hammering test @ Y-end : around 2/15 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|JGW-G2011419]]) * Long term PEM evaluation * Turning off the instruments * Many microphone in the PSL room * Conference * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]]@茂住 (2020/2/22-24) * JPS (2020/3/16-19 @ Nagoya) * Yokozawa, TTanaka * F2F (2020/4/17-20 @ Kashiwa) [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr|wiki]] * GWADW (2020/5/11-16 @ Hokkaido) * KIW7 (2020/5/29-31 @ NCU, Taiwan) ==== Each progress ==== * Yokozawa * Planning toward the O3 run * IX. IY microphone * Instrument switch off * Washimi * Noise around 100Hz @ ER3 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]] * Portable PEM with DataLogger [[https://github.com/gw-pem/kagra-pem/issues/201|GutHub201]] * PEM chassis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11425|JGW-T2011425]] * Kozakai * Coupling with calibration line @ ER3 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11426|slides]] * TTanaka(ICRR) * shaker injection with FPMI * Master thesis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|JGW-G1910387]] * Fujikawa * Lock loss study * TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table * etc |
Weekly PEM meeting
- 2020/01/28(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Finally, we can lock the PRFPMI
- Transmittance laser power became 100 times higher than FPMI
- Lock duration is about 30min at maximum
- OMC commissioning is also ongoing
~100Hz noise and line noise of the higher frequency -> PEM
- Finally, we can lock the PRFPMI
- New PEMs
- We bought the ACO power supply, microphone and accelerometers(end of Feb.)
- Basically the portable PEMs
- PEM plan
- PEM injection
- Shaker injection (TTanaka, Yokozawa)
- Acoustic injection (TTanaka, Yokozawa)
PSL, REFL and AS table injection (Defence of TT Thesis -> tomorrow)
- magnetic field injection (Niigata TTanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- He is writing the thesis
- Hammering test
Hammering test @ Y-end : around 2/15 (JGW-G2011419)
- Long term PEM evaluation
- Turning off the instruments
- Many microphone in the PSL room
- PEM injection
- Conference
Each progress
- Yokozawa
- Planning toward the O3 run
- IX. IY microphone
- Instrument switch off
- Washimi
Noise around 100Hz @ ER3 klog12629
Portable PEM with DataLogger GutHub201
PEM chassis JGW-T2011425
- Kozakai
Coupling with calibration line @ ER3 slides
- TTanaka(ICRR)
- shaker injection with FPMI
Master thesis JGW-G1910387
- Fujikawa
- Lock loss study
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc