* PEM festival * 01/14(Tue) 9:00-15:00 * Evaluate the scattered light for payload (with CRY team) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12293]] * 01/15(Wed) (Maybe expanded) * Turned off almost all FFUs and vacuum pumps |
* Turning off the instruments * Many microphone in the PSL room |
Line 49: | Line 45: |
* Newtonian noise measurement * Thank you for Virgo PEM member! * Francesca mainly measured the newtonian noise * We will discuss in 21st. Jan.(Virgo KAGRA PEM meeting) * PEM measurement * Someday : Effect of the sound to DARM displacement * Someday : Environmental check around BS (including the POP) * Someday : Evaluation of the table cover * Someday : SR2 and SR3 optical lever (Reflection light from SRM?) |
|
Line 64: | Line 49: |
* IX. IY microphone * Instrument switch off |
Weekly PEM meeting
- 2020/01/28(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Finally, we can lock the PRFPMI
- Transmittance laser power became 100 times higher than FPMI
- Lock duration is about 30min at maximum
- OMC commissioning is also ongoing
~100Hz noise and line noise of the higher frequency -> PEM
- Finally, we can lock the PRFPMI
- New PEMs
- We bought the ACO power supply, microphone and accelerometers(end of Feb.)
- Basically the portable PEMs
- PEM plan
- PEM injection to optical table
- Hammering test
- Long term PEM evaluation
- Turning off the instruments
- Many microphone in the PSL room
- Conference
地下宇宙若手研究会@茂住 (2/22-24)
- JPS (2020/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- He is writing the thesis
Each progress
- Yokozawa
- Planning toward the O3 run
- IX. IY microphone
- Instrument switch off
- Washimi
Preparation for the hammering test @ Y-end klog
Sound reverberation study (KAGRA & Virgo)
- Kozakai
- Offline detchar report for the part of the PEM
- TTanaka(ICRR)
shaker injection with FPMIspeaker@12/8,shaker@12/15
Master thesisthesis
- Fujikawa
- Lock loss study2
- fujimopy
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table