Size: 2225
Comment:
|
Size: 1815
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 53: | Line 53: |
* Preparation for the hammering test @ Y-end [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12497|klog]] * Sound reverberation study (KAGRA & Virgo) |
* Preparation for the hammering test @ Y-end * Noise around 100Hz |
Line 57: | Line 57: |
* Offline detchar report for the part of the PEM | * Coupling with calibration line |
Line 60: | Line 60: |
* shaker injection with FPMI[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11117|speaker@12/8]],[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11128|shaker@12/15]] * Master thesis[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|thesis]] |
* shaker injection with FPMI |
Line 63: | Line 63: |
* Lock loss study2 * fujimopy |
* Lock loss study |
Line 70: | Line 69: |
Weekly PEM meeting
- 2020/01/28(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Finally, we can lock the PRFPMI
- Transmittance laser power became 100 times higher than FPMI
- Lock duration is about 30min at maximum
- OMC commissioning is also ongoing
~100Hz noise and line noise of the higher frequency -> PEM
- Finally, we can lock the PRFPMI
- New PEMs
- We bought the ACO power supply, microphone and accelerometers(end of Feb.)
- Basically the portable PEMs
- PEM plan
- PEM injection to optical table
- Hammering test
- Long term PEM evaluation
- Turning off the instruments
- Many microphone in the PSL room
- Conference
地下宇宙若手研究会@茂住 (2/22-24)
- JPS (2020/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- He is writing the thesis
Each progress
- Yokozawa
- Planning toward the O3 run
- IX. IY microphone
- Instrument switch off
- Washimi
- Preparation for the hammering test @ Y-end
- Noise around 100Hz
- Kozakai
- Coupling with calibration line
- TTanaka(ICRR)
- shaker injection with FPMI
- Fujikawa
- Lock loss study
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc