Line 23: Line 23:
  * PEM injection to optical table   * PEM injection
    * Shaker injection (TTanaka, Yokozawa)
    * Acoustic injection (TTanaka, Yokozawa)
      * PSL, REFL and AS table injection (Defence of TT Thesis -> tomorrow)
   * magnetic field injection (Niigata TTanaka, Fujikawa, Yokozawa)
     * Effect of the air cooler magnetic field
     * AS, REFL table injection
     * He is writing the thesis
Line 35: Line 42:
 * PEM injection
  * Shaker injection1 (TTanaka, Yokozawa)
  * acoustic injection (TTanaka, Yokozawa)
   * PSL, REFL and AS table injection
   * Analysis is ongoing
  * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
   * Effect of the air cooler magnetic field
   * AS, REFL table injection
   * He is writing the thesis
Line 53: Line 52:
  * Preparation for the hammering test @ Y-end [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12497|klog]]
  * Sound reverberation study (KAGRA & Virgo)
  * Preparation for the hammering test @ Y-end [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|200121/Minute]]
  * Noise around 100Hz [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]]
  * Portable PEM with DataLogger [[https://github.com/gw-pem/kagra-pem/issues/201|GutHub201]]
  * PEM chassis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11425|JGW-T2011425]]
Line 57: Line 58:
  * Offline detchar report for the part of the PEM   * Coupling with calibration line
Line 60: Line 61:
  * shaker injection with FPMI[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11117|speaker@12/8]],[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11128|shaker@12/15]]
  * Master thesis[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|thesis]]
  * shaker injection with FPMI
Line 63: Line 64:
  * Lock loss study2
  * fujimopy
  * Lock loss study
Line 70: Line 70:

Weekly PEM meeting

  • 2020/01/28(Tue) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Finally, we can lock the PRFPMI
      • Transmittance laser power became 100 times higher than FPMI
      • Lock duration is about 30min at maximum
    • OMC commissioning is also ongoing
    • ~100Hz noise and line noise of the higher frequency -> PEM

  • New PEMs
    • We bought the ACO power supply, microphone and accelerometers(end of Feb.)
    • Basically the portable PEMs
  • PEM plan
    • PEM injection
      • Shaker injection (TTanaka, Yokozawa)
      • Acoustic injection (TTanaka, Yokozawa)
        • PSL, REFL and AS table injection (Defence of TT Thesis -> tomorrow)

      • magnetic field injection (Niigata TTanaka, Fujikawa, Yokozawa)
        • Effect of the air cooler magnetic field
        • AS, REFL table injection
        • He is writing the thesis
    • Hammering test
    • Long term PEM evaluation
    • Turning off the instruments
    • Many microphone in the PSL room
  • Conference

Each progress

  • Yokozawa
    • Planning toward the O3 run
    • IX. IY microphone
    • Instrument switch off
  • Washimi
  • Kozakai
    • Coupling with calibration line
  • TTanaka(ICRR)
    • shaker injection with FPMI
  • Fujikawa
    • Lock loss study
  • TTanaka(Niigata)
    • Magnetic field from air cooler and compressor
    • Magnetic field injection to AS and REFL table
  • etc