Line 32: Line 32:
     * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]]
     * Hammering test @ Y-end : around 2/15 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|JGW-G2011419]])
Line 52: Line 54:
  * Preparation for the hammering test @ Y-end [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|200121/Minute]]
* Noise around 100Hz [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]]
  * Noise around 100Hz @ ER3 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]]
Line 58: Line 59:
  * Coupling with calibration line   * Coupling with calibration line @ ER3
Line 62: Line 63:
  * Master thesis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|JGW-G1910387]]

Weekly PEM meeting

  • 2020/01/28(Tue) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Finally, we can lock the PRFPMI
      • Transmittance laser power became 100 times higher than FPMI
      • Lock duration is about 30min at maximum
    • OMC commissioning is also ongoing
    • ~100Hz noise and line noise of the higher frequency -> PEM

  • New PEMs
    • We bought the ACO power supply, microphone and accelerometers(end of Feb.)
    • Basically the portable PEMs
  • PEM plan
    • PEM injection
      • Shaker injection (TTanaka, Yokozawa)
      • Acoustic injection (TTanaka, Yokozawa)
        • PSL, REFL and AS table injection (Defence of TT Thesis -> tomorrow)

      • magnetic field injection (Niigata TTanaka, Fujikawa, Yokozawa)
        • Effect of the air cooler magnetic field
        • AS, REFL table injection
        • He is writing the thesis
    • Hammering test
    • Long term PEM evaluation
    • Turning off the instruments
    • Many microphone in the PSL room
  • Conference

Each progress

  • Yokozawa
    • Planning toward the O3 run
    • IX. IY microphone
    • Instrument switch off
  • Washimi
  • Kozakai
    • Coupling with calibration line @ ER3
  • TTanaka(ICRR)
  • Fujikawa
    • Lock loss study
  • TTanaka(Niigata)
    • Magnetic field from air cooler and compressor
    • Magnetic field injection to AS and REFL table
  • etc