PEM meeting
2020/07/10(Fri) 16:00-17:00
Zoom2 : https://zoom.us/j/6676627462
No KAGRA wiki page
Information
- KAGRA interferometer status
- Sinet network troble
- We couldn’t connect to Kamioka now
- It will continue several month in the worst case
- Network to Kashiwa server is no problem
- Kashiwa network will stop next week 7/15. 7/16
- Due to the unstable of the suspension, we couldn’t lock the PRFPMI now. Sus team is fixing now
- Sinet network troble
- Paper status
- Status paper (PTEP) submitted to CPC
- Acoustic injection(CQG?) ongoing
- Post observation
- No information from SEO
- Still we have several measurements
- DRFPMI
- Jul. - Aug.
- Start from suspension control upgrade
- Preparation for O4
- Ondotori maintenance (After allowed the mine work)
- Recabling
- We will do re-cabling all the PEMs
- GND issue
- Analysis progress
- Washimi (Acoustic injection)