Differences between revisions 1 and 2
Revision 1 as of 2020-10-06 07:52:24
Size: 9
Comment:
Revision 2 as of 2020-10-06 07:55:37
Size: 1598
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Minutes = Minute of PEM meeting =
----

 * Date: 2020/10/02 17:10-18:00(JST)
 * Attendance: Yokozawa, Fujikawa, Washimi, Yokoyama, Kozakai, Ohkawa, Kume, Uchiyama, Miyoki, Oshino
 * Regular meeting


=== Minutes ===

 * KAGRA schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/G2012041/001/ChamberOpen-Schedule200925-2.pdf|JGW12041]]
  * - 7th Oct. RSE lock trial
  * 5th Oct. - 12th(19th) Oct. Start the cleaning
  * 8th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
  * 14th Oct. blackout (13th, 15th working date for blackout)
  * 19th Oct. - 23rd Oct. Clean work by company
  * 22nd Oct. - 25th Oct. break vacuum
  * 26th Oct. - Open chambers

 * Call for discussion
  * Some measurement if we can lock the DRFPMI
   * Acoustic injection with portable PEMs
   * Noise investigation

  * PEM measurement during blackout
   * Prepare the DAQ during blackout
   * Seismometer + magnetometer + Infrasound microphone + GND
  
  * PEM DAQ racks
   * Use only IX and IY racks
   * Move the position of IX and IY racks

  * New PEMs toward O4
   * Many microphone
    * Not only tables but also booth
   * Position of magnetometer
   * Position of seismometer
   * Additional PEMs to PSL room
    * 120Hz noise
    * glitch study

  * Lock loss study
   * control loop of the ETMX MNR?

  * If you have new idea or discussion item, please write here

 * Fujikawa will visit Kamioka from 4th Oct. to 17th Oct.

 * ICA analysis
  * PR booth injection analysis
  * Now frequency domain -> move to time domain

 * Next PEM meeting 17:00- 2nd Oct.

Minute of PEM meeting


  • Date: 2020/10/02 17:10-18:00(JST)
  • Attendance: Yokozawa, Fujikawa, Washimi, Yokoyama, Kozakai, Ohkawa, Kume, Uchiyama, Miyoki, Oshino
  • Regular meeting

Minutes

  • KAGRA schedule JGW12041

    • - 7th Oct. RSE lock trial
    • 5th Oct. - 12th(19th) Oct. Start the cleaning
    • 8th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
    • 14th Oct. blackout (13th, 15th working date for blackout)
    • 19th Oct. - 23rd Oct. Clean work by company
    • 22nd Oct. - 25th Oct. break vacuum
    • 26th Oct. - Open chambers
  • Call for discussion
    • Some measurement if we can lock the DRFPMI
      • Acoustic injection with portable PEMs
      • Noise investigation
    • PEM measurement during blackout
      • Prepare the DAQ during blackout
      • Seismometer + magnetometer + Infrasound microphone + GND
    • PEM DAQ racks
      • Use only IX and IY racks
      • Move the position of IX and IY racks
    • New PEMs toward O4
      • Many microphone
        • Not only tables but also booth
      • Position of magnetometer
      • Position of seismometer
      • Additional PEMs to PSL room
        • 120Hz noise
        • glitch study
    • Lock loss study
      • control loop of the ETMX MNR?
    • If you have new idea or discussion item, please write here
  • Fujikawa will visit Kamioka from 4th Oct. to 17th Oct.
  • ICA analysis
    • PR booth injection analysis
    • Now frequency domain -> move to time domain

  • Next PEM meeting 17:00- 2nd Oct.

KAGRA/Subgroups/PEM/Meeting/201002/Minute (last edited 2020-10-06 07:57:01 by TakaakiYokozawa)