Weekly PEM meeting
- 2020/11/27(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
After this meeting
- Fujikawa meeting
Agenda
PEM table
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- Abstract deadline : 30th Nov.
- For students, oral presentation at KIW7 and poster presentation at F2F meeting (Really?)
- Presentation
Yokozawa (KIW:Plenary session PEM)
Washimi (KIW:Acoustic inj+sound reverberation time+NN)
Kume (KIW:ICA analysis)
- Fujikawa (KIW+F2F:Lock loss study for thesis)
- JPS meeting
- Deadline 12/3
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- Open chambers
- VIS upgrade
- IMM upgrade
- Please contact us if you will work inside the chamber(take pictures)
- Author list for O3b was opened
- Contribution to PEM for joining the author list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Discussion item
- Start the investigation for measurement of the newtonian noise
- Requested to publish (at least 1 year) seismometer data summary from many directions...
- Timeline for Francesca analysis
- Water fluid issue
- Simulation
- TOBA
- Spectram of the lightening
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<1st DRAFT CIRCULATION>> JGW-P2012122-v1
- Latest meeting : 11/19 17:30~
- Now updating...
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Cleaning the center area
PEM Desk @ IY0 photo
water fluid (github207)
Plan reported in the Chief meeting : JGW-G2012217
- Rental portable fluidmeter : 11/25~12/9
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
- Rack ground GND
- Washimi
- Water fluid
- Kume
- ICA analysis related with PEM