* After this meeting, we will have a practice of KIW7 by Fujikawa-san | |
Line 9: | Line 10: |
* 12/22 10:00 - 12:00 Water fluid + NN noise meeting(Prelininary) | * 12/22 10:00 - 12:00 Newtonian noise meeting (Prelininary) |
Line 17: | Line 18: |
* For students, oral presentation at KIW7 and poster presentation at F2F meeting (Really?) | * For students, oral presentation at KIW7 and poster presentation at F2F meeting |
Line 23: | Line 24: |
* JPS meeting * Submission was finished |
|
Line 35: | Line 33: |
* Temperature control * AC noise at Xend |
|
Line 49: | Line 49: |
* Requested to publish (at least 1 year) seismometer data summary from many directions... * Timeline for Francesca analysis * Water fluid issue * Simulation * TOBA |
* Seismic NN * Requested to publish (at least 1 year) seismometer data summary from many directions * Fractal analysis * Timeline for Francesca analysis * Many seismometers * Accelerometers for wall * Water fluid NN * Fluid meter * Simulation * Atomospheric NN * Relative temperature monitor * Infrasound * Gravity monitor * TOBA * Superconducting Gravimeter |
Line 61: | Line 72: |
* Acoustic injection paper (Washimi) '''<<1st DRAFT modification>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122-v1]] * Latest meeting : 11/19 17:30~ * Playground data is approved! * Now updating... |
* Acoustic injection paper (Washimi) '''<<2nd DRAFT CIRCULATION>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122-v1]] * posted to CPC (12/7), circulated on 12/9 [kagra 03888] * No comments yet |
Line 72: | Line 82: |
* Virgo O3 break paper '''<<PUBLISHED>>''' * [[https://www.mdpi.com/2075-4434/8/4/82]] |
|
Line 74: | Line 87: |
* PEM tasks | * PEM table * k1ctr plan * DELL PC * Cabling issue * Cleaning the center area * PEM cabling plan * New cable rack * Noise mitigation / Environment stability |
Line 76: | Line 97: |
* Cabling issue * Cleaning the center area * PEM cabling plan * New cable rack * water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]]) * One week measurement at Yend * Position dependence * read out of the lightning sensor ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]]) * Discussion with Virgo * PEM table * k1ctr plan * DELL PC |
* Temperature control * PEM sensors * Re-install the ACCs, MICs, MAGs until commissioning start * water fluid monitor * read out of the lightning sensor |
Line 89: | Line 103: |
* if accepted | * PEM injection * Acoustic injection at X/Y-end * Magnetic injection |
Line 95: | Line 112: |
* Rn : contact person -> Guillaume Pronostさん (ICRR, SK) * cosmic-ray : plastic scintillator? * gamma/neutron : 新学術地下宇宙 * start from a geiger counter? |
|
Line 100: | Line 113: |
* Accelerometer for wall * Relative temperature monitor * Many seismometers * Superconducting Gravimeter * TOBA |
|
Line 112: | Line 120: |
* Water fluid [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12301|JGW-G2012301]] | * Water fluid [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12311|JGW-G2012311]] |
Weekly PEM meeting
- 2020/12/11(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
After this meeting
- 12/11 Regular meeting
- After this meeting, we will have a practice of KIW7 by Fujikawa-san
- 12/18 18:00 - 19:00 VK PEM meeting (After KIW7)
- 12/22 10:00 - 12:00 Newtonian noise meeting (Prelininary)
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- For students, oral presentation at KIW7 and poster presentation at F2F meeting
- Presentation
Yokozawa (KIW:Plenary session PEM)
Washimi (KIW:Acoustic inj+sound reverberation time+NN)
Kume (KIW:ICA analysis)
- Fujikawa (KIW+F2F:Lock loss study for thesis)
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMM upgrade
- IYC experience
- Temperature control
- AC noise at Xend
- Please contact us if you will work inside the chamber(take pictures)
- Author list for O3b was opened
- Contribution to PEM for joining the author list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Discussion item
- Start the investigation for measurement of the newtonian noise
- Seismic NN
- Requested to publish (at least 1 year) seismometer data summary from many directions
- Fractal analysis
- Timeline for Francesca analysis
- Many seismometers
- Accelerometers for wall
- Water fluid NN
- Fluid meter
- Simulation
- Atomospheric NN
- Relative temperature monitor
- Infrasound
- Gravity monitor
- TOBA
- Superconducting Gravimeter
- Seismic NN
- We will have a NN meeting in the final week of this December.
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<2nd DRAFT CIRCULATION>> JGW-P2012122-v1
- posted to CPC (12/7), circulated on 12/9 [kagra 03888]
- No comments yet
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary
Fractal paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary (Yokozawa)
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Virgo O3 break paper <<PUBLISHED>>
Preparation for O4
- PEM table
- k1ctr plan
- DELL PC
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- New cable rack
- Noise mitigation / Environment stability
- GND issue
- Temperature control
- PEM sensors
- Re-install the ACCs, MICs, MAGs until commissioning start
- water fluid monitor
- read out of the lightning sensor
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
Progress report
- Yokozawa
- Rack ground GND
- Washimi
Water fluid JGW-G2012311
- Kume
- ICA analysis related with PEM