Weekly PEM meeting
- 2021/03/12(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
JPS meeting URL
- オフライン解析によるKAGRAデータの雑音除去(Kume)
「第七回極低放射能技術」研究会 URL
- 落雷磁場を利用した神岡地下水分量の長期観測(鷲見, 3/25)
- Future conferences
- LVK meetin (online), March 15-19
- GWADW (online), May 17-21, 2021
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
- Future meetings
- next VK PEM meeting : 3/19 or 3/26
- next seismic meeting with JAMSTEC : ?
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IMC commissioning
- Suspension commissioning and interferometer commissioning
- PSL recovery after black out (IMC flash detected)
- Type-C suspension commissioning
- Oplev recovery and calibration
- Noise budget
- Trial of vibration transfer function
- InputX suspension commissioning
- After installing new ACC
- After IMC commissioning
- Sudden blackout occurred at 4th Mar.
- Mostly recovered(DGS, vacuum and so on)
- Need the check of circuit, PD, PEM(?) and so on
- GND report
- Yokozawa reported (8th Mar. 16:00-17:00)
- kagra04074
Discussion item
Start the investigation for measurement of the newtonian noise : NN meeting (URL)
- Portable water fluid monitor
- Permanent water fluid monitor at Yend
- Cabling : 9th March
- Installation : 11-12 March with company
- Report later
Start the discussion about KAGRA seismic motion (URL)
- Share the information and discussion using the timeseries and spectrum plots
- Interesting measurement
- Tilt meter (Do not need because underground experiment?)
- Share the information between Tilt meter measurement at SK area
- Trun over seismometer analysis from Fujikawa-san
- Magnetic field
- Check them after arriving new magnetometer
- Arrive at end of March(?)
- Call for PEM tasks
- This is under discussing
- Call the todo list to KAGRA collaborator
- New collaboration about KAGRA PEM
- We are investigating this issue
- Also, discussed previous PEM meeting
- Call the collaboration(Both KAGRA collaboration and just the collaboration)
- If you know the interesting laboratories, please contact to us.
Contribution to PEM for joining the author list Working list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study and offline subtraction)
- Setting monitors (Cabling, making monitor, ondotori maintenance)
- Others
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Acoustic injection paper (Washimi) <<2nd submission>> arXiv:2012.09294
- modified version was submitted (3/5)
Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Seismic NN paper (Fransisca) <<Submitted to CPC>>
Microphone data -> confirmed
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- Global Cabling issue
- Cleaning the center area
- Cable diagram for IOO, ALS, ISC were done by M.Nakano
- GND investigation for electric rack was done by T.Yokozawa
- Combination of two progress
- Ask company (Candidate SK service)
- Cleaning the center area
- PEM cabling plan
- BS-IYC cable rack (April)
- New cable diagram
- How many ADCs will be prepared? Whitening chassis?
- Set the electric boxes for portable/permanent PEMs
- Noise mitigation / Environment stability
- Raise topics after starting IMC commissioning
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- Some temporal PEMs for IMC-IMM commissioning (Using ADC in IOO1 rack?)
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Connector
- Position
- Measurement plan
- Self noise evaluation
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- Infrasound microphone (ACO4152NHA, 0.05 - 8000 Hz)
- Re-install the ACCs, MICs, MAGs before commissioning start
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Yokozawa
- Take over Fujikawa-san's analysis
- Washimi
- Water fluid monitor
- RI monitor
- Kume
- ICA analysis related with PEM