Weekly PEM meeting
- 2021/04/16(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- GWADW (online), May 17-21, 2021
- Registration deadline May 10
- Rapid registration is recommended
- Registration deadline May 10
- 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
Washimi (& Yokoyama-san) have talk(s)
- Future conferences
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX LVDT ACC installation
- Type-A height check
- PR checks(Tighten the jigs)
- IOO commissioning
- IMC alignment(done)
- Type-C suspension commissioning
- Oplev recovery, characterization and calibration
- Transfer function check
- Noise budget
- Trial of vibration transfer function
- PMC calibration
- Noise budget by PEMs
- VIS upgrade (ongoing)
- SEO budget
- If you need material, please let me know
- Schedule
- Detail discussion in next Monday.
- PEM schedule
- Magnetic field(Done)
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Acoustic injection paper (Washimi) <<Published>> https://doi.org/10.1088/1361-6382/abf89a
Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516
- the English modification service has been finished.
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submit soon>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- Global Cabling issue
- Cleaning the center area
- Ask company (Candidate SK service)
- PEM cabling plan
- BS-IYC cable rack (After golden week)
- New cable diagram
- Discussed today
- Cleaning around IY rack cables(Done)
- MCF rack ready
- Cabling schedule will be finalize next week
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Connector
- Position
- Measurement plan
- Self noise evaluation
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Investigation of ICA analysis
- Task list and todo list
- How to discuss?
- Yokozawa
- Cabling plan
- Infrasound microphone
- PSL, PMC issue(With Yamamoto-san)
- Washimi
Magnetic field JGW-G2112777
- Water fluid monitor
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Seismic motion analysis
- O3GK
- Microseismic
- Long term