Weekly PEM meeting
- 2021/05/21(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- GWADW (online), May 17-21, 2021
- If someone joined, I would like to hear the discussion about PEM
- 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
Washimi (& Yokoyama-san) have talk(s)
- Future conferences
JPS meeting url
- Remote style
- Deadline 6/3
- If you have a plan of presentation, please let me know.
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- Remote style
- Abstract submission : end of May
- If you have a plan of presentation, please let me know.
- 27th KAGRA Face-to-face meeting
- Remote style
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX LVDT ACC installation
- Bp's finalize
- IO commissioning
- Optics characterization
- IMC characterization
- ASC
- PMC calibration
- Noise budget by PEMs
- Sound check
- Optics characterization
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<1st refree comments : finished>> arXiv:2103.06516
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submitted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling plan
- Electric box position (Done)
- BS-IYC cable rack (Done)
- New cable diagram (Done)
- Cleaning around IY rack cables(Done)
- MCF rack ready (Mostly done)
- Cabling around MCF (Done)
- Set electric boxes
- D-sub cablings
- BNC cabling
- Booth MIC setting
- Set calibration factor
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Instrumental noise of sensor measure
PMC noise budget slide
- Investigation of ICA analysis
- Progress
- Washimi
- Lightening analysis
- Infrasound sensor test :
- Water fluid monitor : No report
- Yokozawa
- Cabling plan
- Infrasound microphone
- Seismic motion analysis
- O3GK
- Microseismic
- Long term