Differences between revisions 1 and 2
Revision 1 as of 2021-05-20 07:04:11
Size: 4143
Comment:
Revision 2 as of 2021-05-20 07:10:51
Size: 4606
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2021/05/14(Fri) 17:00-  * 2021/05/21(Fri) 17:00-
Line 4: Line 4:
 * Zoom3 : https://zoom.us/j/5045179604  * Zoom2 : https://zoom.us/j/6676627462
Line 9: Line 9:
  * Registration deadline May 10
   * Rapid registration is recommended
  * If someone joined, I would like to hear the discussion about PEM
Line 15: Line 14:
  * JPS meeting [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|url]]
   * Remote style
   * Deadline 6/3
   * If you have a plan of presentation, please let me know.
Line 16: Line 20:
   * Remote style
   * Abstract submission : end of May
   * If you have a plan of presentation, please let me know.

  * 27th KAGRA Face-to-face meeting
   * Remote style

  * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]]

Weekly PEM meeting

Conference issue

  • GWADW (online), May 17-21, 2021
    • If someone joined, I would like to hear the discussion about PEM
  • 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
    • Washimi (& Yokoyama-san) have talk(s)

  • Future conferences
    • JPS meeting url

      • Remote style
      • Deadline 6/3
      • If you have a plan of presentation, please let me know.
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
      • Remote style
      • Abstract submission : end of May
      • If you have a plan of presentation, please let me know.
    • 27th KAGRA Face-to-face meeting
      • Remote style
    • Other meetings url

    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX LVDT ACC installation
      • Bp's finalize
    • IO commissioning
      • Optics characterization
        • IMC characterization
      • PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Lightening paper (Washimi) <<1st refree comments : finished>> arXiv:2103.06516

  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submitted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling plan
    • Electric box position (Done)
    • BS-IYC cable rack (Ongoing)
    • New cable diagram (Done)
    • Cleaning around IY rack cables(Done)
    • MCF rack ready (Mostly done)
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Pil-Jong
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Instrumental noise of sensor measure slide

    • PMC noise budget
  • Investigation of ICA analysis
    • Progress
  • Washimi
    • Magnet meters calibration : JGW-G2112913

    • Infrasound sensor test : klog16671

    • Water fluid monitor : No report
  • Yokozawa pdf

    • Cabling plan
    • Infrasound microphone
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/210521/Agenda (last edited 2021-05-21 17:06:15 by HirotakaYuzurihara)