Weekly PEM meeting
- 2021/06/04(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- Future conferences
JPS meeting url
- Remote style
- Deadline 6/3
- Yuzurihara(ICRR), Kobayashi(OCU)
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- Remote style
Poster abstract submission -> Extend to 15th June
- If you have a plan of presentation, please let me know.
- 27th KAGRA Face-to-face meeting
- Remote style
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX Suspension commissioning
- Green laser recovery(PLL)
- IMM suspension check
- IO commissioning
- IMC ASC
Initial alignment->beam reached to PR2
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submitted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling plan
- Already done
- Electric box position
- BS-IYC cable rack
- New cable diagram
- Cleaning around IY rack cables
- MCF rack ready
- Cabling around MCF
- Progress
- Future
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- Already done
- PEM sensors
- Vibration projection
- PR2 pylon
- Oplev issue
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Microphone analysis
- Investigation of ICA analysis
- Kobayashi-san future plan
- Progress
- Washimi
ACO power, microphone, infrasound sensor test : JGW-G2112982
- Water fluid monitor : spectrum
- Water NN toy simulation by ROOT/C++ : for cross-check
- Yokozawa
Seismic motion IMCpdf
- Seismic motion analysis
- O3GK
- Microseismic