Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2021-06-04 06:00:04
Size: 4477
Comment:
Revision 5 as of 2021-06-04 12:43:40
Size: 4575
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2021/05/21(Fri) 17:00-  * 2021/06/04(Fri) 17:00-
Line 8: Line 8:
 * GWADW (online), May 17-21, 2021
  * If someone joined, I would like to hear the discussion about PEM
 * 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
   * Washimi (& Yokoyama-san) have talk(s)
 
Line 17: Line 12:
   * If you have a plan of presentation, please let me know.    * Yuzurihara(ICRR), Kobayashi(OCU)
Line 21: Line 16:
   * Abstract submission : end of May    * Poster abstract submission -> Extend to 15th June
Line 38: Line 33:
   * IX LVDT ACC installation
   * Bp's finalize
   * IX Suspension commissioning
   * Green laser recovery(PLL)
   * IMM suspension check
Line 41: Line 37:
   * Optics characterization
    * IMC characterization
    * ASC
   * PMC calibration
   * IMC ASC
   * Initial alignment->beam reached to PR2
   * IMC, PMC calibration
Line 55: Line 50:
Line 62: Line 56:
  * Lightening paper (Washimi) '''<<1st refree comments : finished>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]]

  * Fractal paper (Alessandro) '''<<Submitted to Journal
>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]], [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/Seminar/210128|seminor slide]]
  * Fractal paper (Alessandro) '''<<Reply to referee comment>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]], [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/Seminar/210128|seminor slide]]
Line 77: Line 69:
   * Electric box position (Done)
   * BS-IYC cable rack (Done)
   * New cable diagram (Done)
   * Cleaning around IY rack cables(Done)
   * MCF rack ready (Mostly done)
   * Cabling around MCF (Done)
    * Set electric boxes
    * D-sub cablings
   * Already done
    * Electric box position
    * BS-IYC cable rack
    * New cable diagram
    * Cleaning around IY rack cables
    * MCF rack ready
    * Cabling around MCF
   * Progress
    * Set electric boxes(POP, BS, POS done)(OMC not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16936|klog16936]]
    * D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16907|klog16907]]
   * Future
Line 86: Line 81:
    * Booth MIC setting     * Booth MIC setting(IMC, REFL done)
Line 90: Line 85:
   * Re-install the ACCs, MICs, MAGs before commissioning start    * Current PEM installation
    * PSL partially done (Three ACC, one MIC, two portable MIC)
    * IMC booth, REFL booth done
   * Changed the PEM channel name[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16932|klog16932]]
Line 96: Line 94:
   * Before closing the IMC chambers, IMC vacuum tables    * PR2 pylon
   * Oplev issue
Line 100: Line 99:
   * Low frequency sound injector[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16829|klog16829]]
Line 124: Line 124:
  * Instrumental noise of sensor measure
  * PMC noise budget [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12937|slide]]
  * Microphone analysis
Line 128: Line 127:
  * Kobayashi-san future plan
Line 131: Line 131:
  * Lightening analysis
  * Infrasound sensor test :
  * Water fluid monitor : No report
  * ACO power, microphone, infrasound sensor test : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12982|JGW-G2112982]]
  * Water fluid monitor : spectrum
Line 136: Line 135:
  * Cabling plan
  * Infrasound microphone
  * Seismic motion IMC

Weekly PEM meeting

Conference issue

  • Future conferences
    • JPS meeting url

      • Remote style
      • Deadline 6/3
      • Yuzurihara(ICRR), Kobayashi(OCU)
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
      • Remote style
      • Poster abstract submission -> Extend to 15th June

      • If you have a plan of presentation, please let me know.
    • 27th KAGRA Face-to-face meeting
      • Remote style
    • Other meetings url

    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX Suspension commissioning
      • Green laser recovery(PLL)
      • IMM suspension check
    • IO commissioning
      • IMC ASC
      • Initial alignment->beam reached to PR2

      • IMC, PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submitted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling plan
    • Already done
      • Electric box position
      • BS-IYC cable rack
      • New cable diagram
      • Cleaning around IY rack cables
      • MCF rack ready
      • Cabling around MCF
    • Progress
      • Set electric boxes(POP, BS, POS done)(OMC not yet)klog16936

      • D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)klog16907

    • Future
      • BNC cabling
      • Booth MIC setting(IMC, REFL done)
      • Set calibration factor
  • PEM sensors
    • Current PEM installation
      • PSL partially done (Three ACC, one MIC, two portable MIC)
      • IMC booth, REFL booth done
    • Changed the PEM channel nameklog16932

    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • PR2 pylon
    • Oplev issue
    • Discussion with CAL team about A chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Microphone analysis
  • Investigation of ICA analysis
    • Kobayashi-san future plan
    • Progress
  • Washimi
    • ACO power, microphone, infrasound sensor test : JGW-G2112982

    • Water fluid monitor : spectrum
  • Yokozawa
    • Seismic motion IMC
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo