Line 133: Line 133:
  * Water NN toy simulation by ROOT/C++ : for cross-check
Line 135: Line 136:
  * Seismic motion IMC   * Seismic motion IMC[[attachment: PEM_210604.pdf|pdf]]

Weekly PEM meeting

Conference issue

  • Future conferences
    • JPS meeting url

      • Remote style
      • Deadline 6/3
      • Yuzurihara(ICRR), Kobayashi(OCU)
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
      • Remote style
      • Poster abstract submission -> Extend to 15th June

      • If you have a plan of presentation, please let me know.
    • 27th KAGRA Face-to-face meeting
      • Remote style
    • Other meetings url

    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX Suspension commissioning
      • Green laser recovery(PLL)
      • IMM suspension check
    • IO commissioning
      • IMC ASC
      • Initial alignment->beam reached to PR2

      • IMC, PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submitted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling plan
    • Already done
      • Electric box position
      • BS-IYC cable rack
      • New cable diagram
      • Cleaning around IY rack cables
      • MCF rack ready
      • Cabling around MCF
    • Progress
      • Set electric boxes(POP, BS, POS done)(OMC not yet)klog16936

      • D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)klog16907

    • Future
      • BNC cabling
      • Booth MIC setting(IMC, REFL done)
      • Set calibration factor
  • PEM sensors
    • Current PEM installation
      • PSL partially done (Three ACC, one MIC, two portable MIC)
      • IMC booth, REFL booth done
    • Changed the PEM channel nameklog16932

    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • PR2 pylon
    • Oplev issue
    • Discussion with CAL team about A chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Microphone analysis
  • Investigation of ICA analysis
    • Kobayashi-san future plan
    • Progress
  • Washimi
    • ACO power, microphone, infrasound sensor test : JGW-G2112982

    • Water fluid monitor : spectrum
    • Water NN toy simulation by ROOT/C++ : for cross-check
  • Yokozawa
    • Seismic motion IMCpdf

  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/210604/Agenda (last edited 2021-06-04 17:19:19 by TakaakiYokozawa)