Weekly PEM meeting
- 2021/08/06(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- 27th KAGRA Face-to-face meeting
27-29, Aug. Registration, Remote style
- Registration deadline : August 20 (Fri) 6:00PM JST.
- If you have a plan to have a presentation or poster, please let me know.
- PEM status and publication reports (Yokozawa or Washimi)? : oral
- Water NN (Suzuki) : oral or poster?
- ICA (Kobayashi)? : poster
- LVK meeting
- 6,7,8,9,10 September
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- Suzuki (Tokyo) to Kamioka : 8/16-26
General issue
- Interferometer schedule
- Scheduling meeting (2nd Aug. and Today)
- Procedure toward X arm commissioning
Pcal finalize->Oplev finalize->Suspension health check->Acceptance check
- IO commissioning
- IMC ASC
- ALS
- Initial alignment
- Set oplev to good alignment point (PR2, PR3, ITMX, ETMX)
- Mid size baffle installation
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
XY-end channel assignment[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13125|JGWDco13125] and cabling
- In the future maintenance day, we will re-arrange the rack design
- Channel re-assignment
- Added new ADC to MCF0 and IY0 rack
- ADC for magnetometer
- Will be done today
- Box install for SR/OMC area
- Done
- Seis for BS/OMC
- Voltage monitor
- IX, IY
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Table PEM setting (After IMC ASC commissioning)
- Set calibration factor
- New PEM
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計
- ACO power supply with low frequency
- Vibration projection
- Discussion with CAL team about A chamber
- After Rx PD finalization and before closing chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
Interferometer commissioning glitchly behavior on the PMC heater
Summary page update Omicron for ACC3(PSLroom) magnetometer (Oshino)
Pastavi Band limited RMSを追加
- Nishizawa
- Magnetic field analysis
Find report url
- Hoshino
- Progress
- Investigation of ICA analysis
- Progress
- Washimi
- New SEM :
- Infrasound sensor test :
- Lightening sensor :
- Yokozawa
- Temperature at PSL room
- Seismic motion analysis
- O3GK
- Microseismic
- Long term
Place for memo
This meeting is 100th anniversary meeting !!!
- how many times we have 100th anniversary?