Differences between revisions 2 and 7 (spanning 5 versions)
Revision 2 as of 2021-08-06 07:03:00
Size: 4667
Comment:
Revision 7 as of 2021-08-06 18:13:15
Size: 4879
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
   * 27-29, Aug. [[https://forms.office.com/Pages/ResponsePage.aspx?id=3sqHADRb2kSC3zViN2lm-RYWzIGNRk5NqrajlD9DHD1UN1U1VE5DUEowUkhLMFIzNElWVUhVNFFTTy4u|Registration]]
   * Remote style
   * 27-29, Aug. [[https://forms.office.com/Pages/ResponsePage.aspx?id=3sqHADRb2kSC3zViN2lm-RYWzIGNRk5NqrajlD9DHD1UN1U1VE5DUEowUkhLMFIzNElWVUhVNFFTTy4u|Registration]], Remote style
   * Registration deadline : August 20 (Fri) 6:00PM JST.
Line 12: Line 12:
     * PEM status and publication reports (Yokozawa or Washimi)? : oral
     * Water NN (Suzuki) : oral or poster?
     * ICA (Kobayashi)? : poster
Line 30: Line 33:
 * Kobayashi (OCU) to Kamioka : 7/13-21
Line 32: Line 34:
Line 37: Line 38:
  * Scheduling meeting next Monday(2nd Aug.)   * Scheduling meeting (2nd Aug. and Today)
Line 40: Line 41:
   * [https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?query_id=10|url]    * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?query_id=10|url]]
Line 63: Line 64:
  * Fractal paper (Alessandro) '''<<Reply to referee comment>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]], [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/Seminar/210128|seminor slide]]

  * Newtonian noise paper (Francesca) '''<<Accepted by PRD>>'''
Line 77: Line 75:
    * In the future maintenance day, we will re-arrange the rack design
Line 78: Line 77:
    * Added new ADC to MCF0 and IY0 rack
Line 79: Line 79:
    * Will be done today
Line 80: Line 81:
    * Done
Line 88: Line 90:
  * PEM sensors
   * Changed the PEM channel name
   * water fluid monitor
   * Magnetometers for Schumann resonance [[https://www.metronix.de/metronixweb/fileadmin/user_upload/Dokumente/Geophysiks/Induction%20Coil%20MFS-06e/FlyerMFS-06e_jap_v35.pdf|MFS-06e]]
    * Develop the satellite box
  * New PEM
   * Ondotori
   * Pt 100 by ondotori
   * TEAC710
   * 電界計
   * ACO power supply with low frequency
Line 120: Line 123:
 * Hoshino
  * Progress
 
 * Yuzurihara
  * Interferometer commissioning [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17760|glitchly behavior on the PMC heater]]
  * Summary page update [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17815 | Omicron for ACC3(PSLroom) ]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17628|magnetometer (Oshino)]]
  * Pastavi [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17823|Band limited RMSを追加]]
Line 127: Line 132:
 * Yuzurihara
  * Microphone analysis
 * Hoshino
  * Progress
 
Line 149: Line 154:
  * how many times we have 100th anniversary?

Weekly PEM meeting

Conference issue

  • 27th KAGRA Face-to-face meeting
    • 27-29, Aug. Registration, Remote style

    • Registration deadline : August 20 (Fri) 6:00PM JST.
    • If you have a plan to have a presentation or poster, please let me know.
      • PEM status and publication reports (Yokozawa or Washimi)? : oral
      • Water NN (Suzuki) : oral or poster?
      • ICA (Kobayashi)? : poster
  • LVK meeting
    • url

    • 6,7,8,9,10 September
  • JPS meeting url

    • Yuzurihara(ICRR) : 14pW3-5
    • Kobayashi(OCU)
    • Washimi(NAOJ) in "Environmental physics session"
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • Suzuki (Tokyo) to Kamioka : 8/16-26

General issue

  • Interferometer schedule
    • Scheduling meeting (2nd Aug. and Today)
    • Procedure toward X arm commissioning
      • url

      • Pcal finalize->Oplev finalize->Suspension health check->Acceptance check

    • IO commissioning
      • IMC ASC
      • ALS
    • Initial alignment
      • Set oplev to good alignment point (PR2, PR3, ITMX, ETMX)
    • Mid size baffle installation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • XY-end channel assignment[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13125|JGWDco13125] and cabling

      • In the future maintenance day, we will re-arrange the rack design
    • Channel re-assignment
      • Added new ADC to MCF0 and IY0 rack
    • ADC for magnetometer
      • Will be done today
    • Box install for SR/OMC area
      • Done
    • Seis for BS/OMC
    • Voltage monitor
    • IX, IY
    • BNC cabling
    • Booth MIC setting(IMC, REFL done)
    • Table PEM setting (After IMC ASC commissioning)
    • Set calibration factor
  • New PEM
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計
    • ACO power supply with low frequency
  • Vibration projection
    • Discussion with CAL team about A chamber
    • After Rx PD finalization and before closing chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

Place for memo

  • This meeting is 100th anniversary meeting !!!

    • how many times we have 100th anniversary?

KAGRA/Subgroups/PEM/Meeting/210806/Agenda (last edited 2021-08-06 18:13:15 by HirotakaYuzurihara)