Weekly PEM meeting
- 2021/10/22(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Important notice
- 文春関係の取材が来たらICRR事務に連絡するようにしてください。
Meeting and Conference issue
- Next VK PEM meeting
- 10/28 19:00- (JST)
Water NN & Ocean wave
- Suzuki-san with support of Washimi-san
- Hoshino-san with support of Yokozawa
宇宙素粒子若手の会 秋の研究会 URL
- 11/5-7 @ Kashiwa
- Registration Deadline : 10/2
- 第2回新学術「地下宇宙」若手研究会
- 2021年11月25日(木)~26日(金) @ 神戸大
- Registration : 11月12日(金)まで
- Supernovae Workshop (12/1,2)
- Online
- Registration deadline: November 28, 2021
- JPS meeting
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- Kume 10/26 - 10/31
- Kobayashi 10/24 - 10/31
General issue
- Interferometer schedule
- Procedure toward X arm commissioning
Suspension health check->Acceptance check
- Commissioning of tower part suspension
- PCal/TCam finalize
- Mirror height measurement
- IO commissioning
- IMC ASC
- IR alignment
- Beam profile measurement
- Mid size baffle installation
- Green
- Glitch identification
- Y arm commissioning
- SR3 suspension commissioning
- Green Y alignment
- Oplev preparation
- Procedure toward X arm commissioning
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- PWT has almost finish writing. Colabolator circulation will be soon.
- Reverberation time paper (Washimi+)
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- Realtime and medm modification
- Useful medm screen (Ongoing)
- Voltage monitor
- Watt monitor
- Start something?
- Booth MIC setting
- BS, SR done
- Table PEM setting (After IMC ASC commissioning)
- Set calibration factor
- New PEM
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- Seis for BS/OMC
- Set seismometer around OMC area
- Prepare the seismometer around BS (Today?)
- Vibration projection
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
Water fluid meter meintenance klog18556
- Microseismic analysis
- Yokozawa
- Temperature at PSL room
- Analysis of Xend PCal hammering
- Analysis of OMC chamber hammering
- Seismic motion analysis
- O3GK
- Microseismic
- Long term