Weekly PEM meeting
- 2021/12/17(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Task list for authorship
Task list for authorship
Task list 2021/01 - 2021/12
Current version of PEM task list authorlisttasklist_PEM_211210.pdf
- PEM installation
- PEM performance check
- New PEM investigation
- PEM management
- PEM monitoring
- Alert system using PEM
- PEM injection
- PEM study
- PEM group management
- If you have a bottom-up task, please contact to Yokozawa
- Schedule
12/15(水)までにPEM内にてtasklistを作成し、SEOにあげる-> SEO check now
- その後年明けぐらい(?)にcollaboratorにtasklistが回るので1/26までにcontribution planを登録する
- 2/23までにそれぞれの登録がapproveかどうかの判断が行われる
- 3/31までに最終的な2021年のauthor listが作成される
Meeting and Conference issue
- VK PEM meeting
- 2021/12/23(Thu) 19:00-
- ICA and KAGRA status
- 2021/12/23(Thu) 19:00-
- KAGRA F2F
- 12/20,21 @ Online
Program URL
- SEO(2) Kume : Latest result of ICA noise subtraction
- Future Yokozawa : Middle frequency noise, Kume : Noise subtraction of acoustic noise
- Poster Yokozawa and Hoshino
新学術領域「地下宇宙」第8回超新星ニュートリノ研究会 http://www.lowbg.org/ugap/ws/sn2022/index.html
- 2022年1月6日(木)、7日(金) @ 早稲田+オンライン
- 講演申込締切:2021年12月6日(月)
鷲見(Noise budget, JGW-G2213555)
- 参加申込締切:2022年 1月 5日(水)
JPS meeting URL
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
- 登壇登録 : 11月16日 ~ 12月2日
- 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
鷲見(Noise budget, JGW-G2213473)
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No plan
- From Kamioka
- Washimi (Tokyo, New year)
- To Kamioka
General issue
- Procedure toward X arm commissioning
- Acceptance check for closing the chamber : Discussed
- Closed the EX area and stared the pumping down 0.05 Pa this morning
- PR2 trouble; Trouble of rotating part
- If all repairing work well, we can recover next Wednesday
- After green lock recovery, we will start pumping down at IX
- IO commissioning
- IMC ASC
- Power budget
- IR alignment
- Many people visit Kamioka this week
- IR alignment after IMM : IR beam reached PR3
- REFL table setting using reflecting beam from ITMX : Not completed, after recovery of PR2
- Oplev beam path : Done
- TMSY table windshield : Done
- Each optical table check : Done
- Beam profiling : Done
- Mid size baffle installation
- After IR alignment
- Y arm commissioning
- SR's suspension commissioning
- Green Y alignment
- Oplev preparation
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Collaborator circulation (since F2F)
Invited review paper (Washimi+) JGW-P2113549
- Acoustic reverberation time paper (Washimi+)
- Washimi will write in the New Year holidays
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New oplev noise budget
- IX
- Main work : December
- Prepare to set the PEMs
- Electrical box
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- New PEM
- PSL room with Cryocon
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Sound monotor
- Yokozawa
- IX oplev noise budget
- Seismic motion analysis
- O3GK
- Microseismic
- Long term