Weekly PEM meeting
- 2022/01/28(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
JPS meeting URL
2022年3月15日(火)~3月19日(土)@ 岡山大学 program
- 2月中旬に現地開催判断?
- 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
鷲見(Noise budget, JGW-G2213473)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No plan
- From Kamioka
- No plan
- To Kamioka
General issue
- Tonga volcano
- Washimi-san will present the first result
- If you have some idea of science, please let me know
- Procedure toward X arm commissioning
- IR cavity lock succeeded
- IO commissioning
- IMC ASC
- New QPD monitor
- BS for ISS, new steering mirror
- Mid size baffle installation
- After IR alignment
- Y arm commissioning
Green Y alignment SR3->ETMY->POS table
- ETMY alignment done
- PCal finalize
- Oplev preparation : ongoing
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Collaborator circulation (~1/7)
Invited review paper (Washimi+) JGW-P2113549
- Acoustic reverberation time paper (Washimi+)
- Washimi will write in the New Year holidays
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- ACO power supply
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- New PEM
- PSL room with Cryocon
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi : No update
- Data Quality Report
1/25~27 DQR Hackathon
- 1st day : basic lecture about DQR by Joe and Derek
- 2nd day : started to develop concrete code for DQR tasks
- 3rd day : (same as 2nd day) Yuzurihara contributed to develop the task for computing the inspiral range
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga
- Yokozawa
- EX oplev noise budget
- Seismic motion analysis
- O3GK
- Microseismic
- Long term